Operation
R-Concept
134 / 564
6.3.2.3.4.2 Finish order at R-Transfer Professional
client
new client
clients
25
17
26
No. Name
With R-Transfer Professional you can select from the imported by you data (
) the customer name, field name and driver name. This data will be
associated along with the machine data to the current order. Click first on the field
"Client" (
17
), then choose from the sidebar (
25
) the first letters of the last name. In the
left half of the screen you will see the complete contact details and the fields assigned
to this client.
Complete your entry by pressing the confirmation key (
26
). Then you will be directed
to the field selection. If you do not find the required customer in the customer data-
base, you can enter it as described on the page
will not be recorded in the customer data base, but only saved in the order data base.
Содержание Tiger 6
Страница 3: ...Contents 3 564 Contents...
Страница 4: ...Contents 4 564...
Страница 13: ...Preface 13 564 1 Preface...
Страница 14: ...Preface 14 564...
Страница 22: ...Safety 22 564...
Страница 23: ...Safety 23 564 2 Safety...
Страница 24: ...Safety 24 564...
Страница 41: ...General View and Specifications 41 564 3 General View and Specifications...
Страница 42: ...General View and Specifications 42 564...
Страница 53: ...General Description 53 564 4 General Description...
Страница 54: ...General Description 54 564...
Страница 57: ...Operating Components 57 564 5 Operating Components...
Страница 58: ...Operating Components 58 564...
Страница 63: ...Operating Components Driver s cabin overview 63 564 13 14 15 13 First aid box 14 Blow gun 15 USB interface...
Страница 98: ...Operation 98 564...
Страница 99: ...Operation 99 564 6 Operation...
Страница 100: ...Operation 100 564...
Страница 226: ...Operation Defoliator 226 564 RIS defoliator RES defoliator...
Страница 256: ...Operation Lifter 256 564 6 14 4 Setting rollers movement height High rollers movement High rollers movement...
Страница 291: ...Operation Infeed conveyor 291 564 2 1 1 Infeed conveyor control block...
Страница 299: ...Operation Strainer wheels turbines 299 564 4 Rpm strainer wheels...
Страница 325: ...Operation Bunker unloading 325 564 6 19 Bunker unloading...
Страница 327: ...Operation Bunker unloading 327 564 45 51 50 47 46 52 53 54 48 55 49 56 Key overview See Page 88...
Страница 361: ...Maintenance and Service 361 564 7 Maintenance and Service...
Страница 362: ...Maintenance and Service 362 564...
Страница 418: ...Maintenance and Service Defoliator 418 564 Defoliator in the maintenance position...
Страница 475: ...Malfunction and Remedies 475 564 8 Malfunction and Remedies...
Страница 476: ...Malfunction and Remedies 476 564...
Страница 527: ...Lists Tables Plans Diagrams Maintenance Verification 527 564 9 Lists Tables Plans Diagrams Maintenance Verification...
Страница 528: ...Lists Tables Plans Diagrams Maintenance Verification 528 564...
Страница 558: ...558 564...
Страница 559: ...Index 559 564 10 Index...
Страница 560: ...Index 560 564...