Maintenance
SSD Disk Maintenance
60
CLIPSTER | Hardware Guide | Hardware Generation V+
Rohde & Schwarz DVS GmbH
Reassembling the SSD Disk
After replacing the SSD disk, the disk carrier with the new disk
has to be reassembled in the system.
Perform the following steps:
1.
Slide the disk carrier back into its shaft at the disk array.
2.
Push the disk carrier completely back into the shaft by
applying pressure to the disk carrier directly (i.e. do not use
the lever to push the carrier). Move it until you feel the resis-
tance of the SSD disk interface inside the system and until the
lever retracts by itself from the pushing.
3.
Close the lever until it snaps back in place which as a result
will slide the carrier completely back in.
4.
Once the faceplate of the R&S DVS system is back in place,
the replacement of the SSD disk is finished. After several
minutes the replaced SSD disk will be automatically recog-
nized by the system. Then the rebuild of the data will be initi-
ated on its own. When the system has finished the rebuild, the
R&S DVS system will be fully operational again.
It is important that you do not use the lever to insert the
disk carrier. Apply an even pressure only to the carrier di-
rectly until the lever moves back by itself.
The disk carrier of the replaced disk should be level with
the others of the array.
Accesses to the Disk Array
During a rebuild, realtime processes may not be
possible. It is recommended to restrict accesses to
the SSD disk array until the rebuild is finished, as it
takes several hours.
Avoid accesses to the disk array during this
time, otherwise it may take considerably
longer.
Содержание CLIPSTER
Страница 1: ...R S CLIPSTER Hardware Guide ...
Страница 4: ... 4 CLIPSTER Hardware Guide Hardware Generation V Rohde Schwarz DVS GmbH ...
Страница 20: ...Introduction Important Notes 20 CLIPSTER Hardware Guide Hardware Generation V Rohde Schwarz DVS GmbH ...
Страница 46: ...Overview Overview of the Rear 46 CLIPSTER Hardware Guide Hardware Generation V Rohde Schwarz DVS GmbH ...
Страница 52: ...Operation Operating the System 52 CLIPSTER Hardware Guide Hardware Generation V Rohde Schwarz DVS GmbH ...
Страница 72: ...Maintenance Power Supply Maintenance 72 CLIPSTER Hardware Guide Hardware Generation V Rohde Schwarz DVS GmbH ...
Страница 94: ...Appendix Conformity Declarations 94 CLIPSTER Hardware Guide Hardware Generation V Rohde Schwarz DVS GmbH ...
Страница 98: ...98 CLIPSTER Hardware Guide Hardware Generation V Rohde Schwarz DVS GmbH Index ...