background image

November 2018

ZIPSCREEN-SKYLIGHT

 

INSTALLATION MANUAL

Содержание Zipscreen-Skylight

Страница 1: ...November 2018 ZIPSCREEN SKYLIGHT INSTALLATION MANUAL...

Страница 2: ...ver for any damages incurred by you resulting from errors in or omissions from the information included herein Rollease Acmeda reserves the right to make changes without further notice to any products...

Страница 3: ...n Manual November 2018 2018 Copyright All Rights Reserved Rollease Acmeda SYSTEM INDEX 1 Spring Fabric Box 2 Motor Spool Box 3 Spring Fabric Tube 4 Motor Spool Tube 5 U Channel 6 Inner Rails w Funnel...

Страница 4: ...opyright All Rights Reserved Rollease Acmeda INSTALL BOXES INSTALL SIDE CHANNELS STEP 1 FIX BOXES RELATIVE TO INSTALLATION SPACE STEP 1 SLIDE U CHANNEL ONTO BOX EARS STEP 2 LEVEL U CHANNEL AND FIX ALO...

Страница 5: ...RIC SPRING TUBE INTO BOX STEP 1 LOCK SPRING HEAD AS SHOWN STEP 2 ADD PRE TURNS REFER TO PRE TENSION CHARTS FOR PRE TURNS REQUIRED Rollease Acmeda does not recommend exceeding suggested pre turn values...

Страница 6: ...15 14 14 14 14 14 14 1 80 14 15 15 15 15 15 15 15 15 15 14 15 15 15 15 15 15 6 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 1...

Страница 7: ...17 17 17 16 16 16 16 16 16 16 16 16 16 1 80 16 16 16 16 16 6 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 2 00 16 16 16 16 16 16 16 16 16 16 16 16 16 16 15 15 15 15 15 15 15 15 15 16 16 1...

Страница 8: ...UBE INTO BOX INSTALLING MOTOR SPOOL TUBE INTO BOX STEP 3 INSTALL FABRIC SPRING TUBE Ensure idler shafts are correctly installed STEP 1 INSTALL MOTOR HEAD ONTO MOTOR BRACKET 1 1 2 SECTION B INSTALLATIO...

Страница 9: ...se Acmeda INSTALLING INNER RAILS STEP 1 UNLOCK PRE TENSION IDLER SECTION B INSTALLATION NOTE Ensure apprx 380mm 15 of fabric is rolled off the tube before unlocking Rest end caps in U Channel Shade sh...

Страница 10: ...Copyright All Rights Reserved Rollease Acmeda INSTALLING INNER RAILS STEP 2 INSTALL INNER RAILS AT FABRIC SPRING END FIRST THEN SWING IN STEP 3 EXTEND AND HOLD OUT SHADE TO INSERT FUNNEL STOPS SECTIO...

Страница 11: ...right All Rights Reserved Rollease Acmeda ATTACHING PULL TAPE STEP 1 ATTACH PULL TAPE TO THE SPOOLS ON MOTOR TUBE STEP 2 SLIDE SPOOL TOWARDS END PLATES UNTIL THE TAPE IS HIDDEN INSIDE THE INNER RAIL S...

Страница 12: ...DRAWING IS THE SOLE PROPERTY OF ROLLEASE ACMEDA ANY REPRODUCTION IN PART OR WHOLE WITHOUT THE WRITTEN PERMISSION OF ROLLEASE ACMEDA IS PROHIBITED UCT SPECIFICATION SHEET 15 Mar 2018 DRAWN www rolleas...

Страница 13: ...rved Rollease Acmeda TESTING SKYLIGHT INSTALLING BOX COVERS SECTION B INSTALLATION STEP 1 SET MOTOR LIMITS AND TEST OPERATION STEP 1 SWING BOX COVERS INTO PLACE STEP 2 FIX INTO PLACE WITH SCREW OR RIV...

Отзывы: