Page 2.1
EASY SPRING ULTRA Installation Manual | April 2017
© Copyright 2017 | Rollease Acmeda Group
SECTION 2
− INSTALLATION
PART A
– PREPARING INSTALLATION SPACE
STEP 1 – ENSURE TOP OF INSTALLATION SPACE IS LEVEL
PART B
– MOUNTING BRACKET AND SHADE (BLIND) INSTALLATION
STEP 1 – INSTALL BRACKETS TO WALL / CEILING USING APPORPRIATE FASTENERS TO SUIT APPLICATION
WALL MOUNT (FACE FIX)
CEILING MOUNT (TOP FIX)
NOTE: Install additional Easy‐Link bracket if required
STEP 2 – INSTALL SHADE (BLIND) ONTO MOUNTING BRACKETS
Ensure the Rib and Arrows on the spring control are always on top/pointing up