Page. 9
Easy Spring Ultra Skyline
Installation
Manual | v2.0
2021 ©Copyright All Rights Reserved Rollease Acmeda
PART D – SET LIMITS
SECTION B | INSTALLATION
STEP 1 – SET TOP LIMIT
STEP 2 – TEST LIMITS & SHADE FUNCTIONALITY
Ensure shade is fully raised
Operate Shade up & down
To lower the top limit position rotate limiter head
so that the shade moves down.
To raise the top limit position rotate limiter head
so that the shade raises.
The shade must not be locked by the spring to
allow hem bar to move up.
*Standard back roll shown, reverse for front roll