1. Getting Started
8
Space Required for Installation
Ensure enough space around the machine for installation. The space shown is necessary for operating the
machine and for work done by a service engineer.
1.
Rear: 155 cm (61.0 inches) or more
2.
Right and left: 100 cm (39.4 inches) or more
3.
Front: 105 cm (41.3 inches) or more
4.
Depth: 467 cm (183.9 inches) or more
5.
Width: 681 cm (268.1 inches) or more
About Moving the Machine
Relocation of the machine should be performed by your service representative. Contact your authorized
Roland DG Corporation representative if you need to relocate the machine.
How to secure the machine
The legs of the machine are equipped with leveling feet for securing the machine.
Be sure to confirm that the machine is secured by the leveling feet before turning on the power of the
machine.
If you print when the machine is not secured by the leveling feet, the machine may move accidentally.
•
Be sure to adjust the level foot to keep the machine flat. Using the machine on an unstable
surface might cause an injury or unexpected accident.
Содержание IU-1000F
Страница 2: ......
Страница 6: ...4 ...
Страница 22: ...1 Getting Started 20 As seen from the back of the machine ...
Страница 54: ...3 Basic Operations 52 If the ink configuration is set to Double White Ink Config ...
Страница 84: ...4 Convenient Usage 82 ...
Страница 122: ...5 Troubleshooting 120 ...
Страница 138: ...6 Maintenance and Specifications 136 ...
Страница 142: ...140 MEMO ...
Страница 143: ......
Страница 144: ...R2 191227 1000022481 2019 Roland DG Corpora on November 2019 M0DW7016 ...