20
3 Replacement of Main Parts
3
3-2 CARRIAGE WIRE_REMOVING
SCREW B
SCREW A
CARRIAGE WIRE
1
Remove the GUIDE RAIL COVER, LEFT & RIGHT SIDE
COVER and TOOL CARRIAGE.
2
Loosen SCREW A and SCREW B in order to loosen the
CARRIAGE WIRE TENSION.
3
Remove the CARRIAGE WIRE from the DRIVE PULLEY.
4
Remove the CARRIAGE MOTOR.
CARRIAGE MOTOR
Содержание CAMM-1 PRO CM-300
Страница 4: ... MEMO ...
Страница 6: ...2 1 Structure Spare Parts 1 1 2 FRAME ...
Страница 28: ...24 3 Replacement of Main Parts 3 MEMO ...
Страница 62: ......
Страница 63: ...CM 500 400 300 ...