
6-2 Inspection and Maintenance
When to Service the Spindle
As a general guide, replace the bearings for the spindle unit after every 2,000 hours. Also, as a general guide, replace the
spindle motor after every 8,000 hours. These replacement times may vary according to conditions of use.
For replacement, contact your authorized Roland DG Corp. dealer or Roland DG Corp. service center.
100
Chapter 6 Maintenance
Содержание Aproll MDX-540
Страница 2: ......
Страница 23: ...21 Chapter 1 Introduction ...
Страница 31: ...29 Chapter 2 Emplacement and Installation ...
Страница 40: ...38 ...
Страница 41: ...39 Chapter 3 Basic Operation ...
Страница 58: ...56 ...
Страница 59: ...57 Chapter 4 Getting Ready for and Performing Cutting ...
Страница 79: ...77 Chapter 5 Handy Panel ...
Страница 94: ...92 ...
Страница 95: ...93 Chapter 6 Maintenance ...
Страница 103: ...101 Chapter 7 What to Do If ...
Страница 109: ...107 Chapter 8 Specifications ...
Страница 118: ......
Страница 119: ......
Страница 120: ...R9 180316 ...