Rockwell Automation Publication 7000L-UM301F-EN-P - March 2020
203
Commissioning
Chapter 4
Figure 187 - SCR Sharing Resistance Test
SCR Gate-to-cathode Resistance
One test that can be performed on SCRs that cannot be performed on SGCTs is
a Gate-to-cathode Resistance Test. Performing a Gate-to-cathode resistance
measurement will identify damage to a SCR by revealing either an open or
shorted gate-to-cathode connection. To test an SCR from gate-to-cathode,
disconnect the SCR gate leads from the self powered gate driver board and
measure the gate-to-cathode resistance on the SCR firing card Phoenix
connector as shown in
.
Red Wire at
2-pole connector
Snubber Test Point
Red Wire at
2-pole connector
Snubber Test Point
Содержание Allen-Bradley PowerFlex 7000
Страница 32: ...32 Rockwell Automation Publication 7000L UM301F EN P March 2020 Chapter 1 Overview of Drive Notes ...
Страница 90: ...90 Rockwell Automation Publication 7000L UM301F EN P March 2020 Chapter 2 Drive Installation Notes ...
Страница 174: ...174 Rockwell Automation Publication 7000L UM301F EN P March 2020 Chapter 4 Commissioning NOTES ...
Страница 264: ...264 Rockwell Automation Publication 7000L UM301F EN P March 2020 Chapter 4 Commissioning Notes ...
Страница 412: ...412 Rockwell Automation Publication 7000L UM301F EN P March 2020 Chapter 5 Component Definition and Maintenance ...
Страница 420: ...420 Rockwell Automation Publication 7000L UM301F EN P March 2020 Appendix A Catalog Number Explanation Notes ...
Страница 428: ...428 Rockwell Automation Publication 7000L UM301F EN P March 2020 Appendix C Meggering Notes ...
Страница 432: ...432 Rockwell Automation Publication 7000L UM301F EN P March 2020 Appendix D Preventative Maintenance Schedule Notes ...
Страница 433: ......