Rockwell Automation Publication 6000-UM002G-EN-P - August 2022
143
Appendix E Spare Parts Storage
Figure 74 - Reforming Process for Power Cells Outside VFD
3. Slowly increase the regulator input voltage to 50% and maintain the
voltage for 10 minutes.
4. Slowly increase the regulator input voltage to 80% and maintain the
voltage for 15 minutes.
5. Slowly increase the regulator input voltage to 100% and maintain the
voltage for 15 minutes.
6. Once this procedure is complete, decrease the voltage source to 0V and
open the MCB. Disconnect the voltage regulator from the VFD and the
power supply. Return wire connections to its original configuration after
the power cell has fully discharged.
WARNING:
During this step, monitor and check for any abnormalities. If
any abnormalities occur, turn off the MCB immediately.
WARNING:
During this step, monitor and check for any abnormalities. If
any abnormalities occur, turn off the MCB immediately.
WARNING:
During this step, monitor and check for any abnormalities. If
any abnormalities occur, turn off the MCB immediately.
WARNING:
If abnormalities occur, verify the connections as described in Step 1.
Verify that the power cell fuse is in good condition and record any abnormality.
Contact a Rockwell Automation field support engineer for assistance.
Voltage
(%)
100
80
50
30
Time (min)
0
5
15
30
45
Содержание Allen-Bradley PowerFlex 6000
Страница 10: ...10 Rockwell Automation Publication 6000 UM002G EN P August 2022 Preface Notes ...
Страница 82: ...82 Rockwell Automation Publication 6000 UM002G EN P August 2022 Chapter 4 Parameters and Function Codes Notes ...
Страница 134: ...134 Rockwell Automation Publication 6000 UM002G EN P August 2022 Appendix C Preventative Maintenance Schedule Notes ...
Страница 136: ...136 Rockwell Automation Publication 6000 UM002G EN P August 2022 Appendix D Torque Requirements Notes ...
Страница 148: ...148 Rockwell Automation Publication 6000 UM002G EN P August 2022 Appendix E Spare Parts Storage Notes ...