Rockwell Automation Publication 6000-UM002G-EN-P - August 2022
111
Chapter 5 Preventative Maintenance and Component Replacement
Inspect UPS
1. Check that there are no obstructions or dirt/debris in the exhaust heat
fan.
2. Verify that there are no visible signs of damage.
Check UPS Output Voltage
1. Open the LV Control cabinet door.
2. Turn off the back-up control power circuit breaker (CB5) and the
customer-supplied power supply circuit breaker (CB1).
Figure 59 - Circuit Breaker Location in LV Control Cabinet (for A-Frame)
IMPORTANT
If the drive has not been turned on for more than 3 months, the UPS
batteries must be charged for at least 10 hours. Apply either MV to the
drive or customer-supplied control power.
LV control relays
Circuit breakers
Содержание Allen-Bradley PowerFlex 6000
Страница 10: ...10 Rockwell Automation Publication 6000 UM002G EN P August 2022 Preface Notes ...
Страница 82: ...82 Rockwell Automation Publication 6000 UM002G EN P August 2022 Chapter 4 Parameters and Function Codes Notes ...
Страница 134: ...134 Rockwell Automation Publication 6000 UM002G EN P August 2022 Appendix C Preventative Maintenance Schedule Notes ...
Страница 136: ...136 Rockwell Automation Publication 6000 UM002G EN P August 2022 Appendix D Torque Requirements Notes ...
Страница 148: ...148 Rockwell Automation Publication 6000 UM002G EN P August 2022 Appendix E Spare Parts Storage Notes ...