62
Rockwell Automation Publication 1512A-UM101B-EN-P - December 2021
Chapter 5 Maintenance
Figure 48 - Isolation Switch Defeater
3. Phase 3 (far right linkage) must be measured for overall travel.
All three phases share the same main actuating shaft but the Phase 3 is
the easiest to measure.
Figure 49 - Isolation Switch Linkage Assembly Location
4. Rest the customer-supplied digital protractor on the bottom of the
isolation switch linkage assembly.
The angle of the linkage must be 180º or slightly higher, with a tolerance
of 0/+6º.
Closed position
Open position
Isolation Switch
Operating
Handle
Isolation
Switch
Defeater
Isolation Switch Linkage
Assembly (Phase 3)
If a digital protractor is unavailable, lay a straight edge
against the bottom of the steel lever on the operating
shaft to check for parallel alignment of the red link.
Содержание Allen-Bradley CENTERLINE 600
Страница 6: ...6 Rockwell Automation Publication 1512A UM101B EN P December 2021 Notes ...
Страница 12: ...12 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 1 General Information Notes ...
Страница 26: ...26 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 2 Installation Standard Enclosure ...
Страница 38: ...38 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 3 Installation Arc Resistant Notes ...
Страница 45: ...Rockwell Automation Publication 1512A UM101B EN P December 2021 45 Chapter 4 Common Installation ...
Страница 72: ...72 Rockwell Automation Publication 1512A UM101B EN P December 2021 Chapter 6 Spare Parts Notes ...
Страница 108: ...108 Rockwell Automation Publication 1512A UM101B EN P December 2021 Index Notes ...