Rockwell Automation Publication 7712-UM001D-EN-P - October 2017
55
Maintenance
Chapter 5
Ground Connection Inspection
1. Inspect the torque seal for the ground connection.
2. If seal is broken, apply 11 lb•ft (14.5 N•m) to secure and apply torque
seal.
Figure 39 - Ground Connection Inspection
Toggle Assembly Inspection
1. Inspect the torque seal of the shoulder bolt for the toggle assembly.
2. If seal is broken, apply 4.4 lb•ft (6.0 N•m) to secure the shoulder bolt
and apply torque seal.
Figure 40 - Toggle Assembly Inspection
Содержание Allen-Bradley 7712
Страница 6: ...6 Rockwell Automation Publication 7712 UM001D EN P October 2017 Table of Contents Notes ...
Страница 10: ...10 Rockwell Automation Publication 7712 UM001D EN P October 2017 Preface Notes ...
Страница 14: ...14 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 1 General Information Notes ...
Страница 24: ...24 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 25: ...Rockwell Automation Publication 7712 UM001D EN P October 2017 25 Start up Procedure Chapter 3 ...
Страница 26: ...26 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 36: ...36 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 4 Equipment Operation Notes ...
Страница 58: ...58 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 5 Maintenance Notes ...
Страница 73: ......