Rockwell Automation Publication 7712-UM001D-EN-P - October 2017
15
Chapter
2
Safety Interlock and Accessibility
Requirements
Recommended Torque
Values
When installing line and load cables or enclosure access panels, use the
following torque specifications.
Table 2 - Hardware Torque Specifications
ATTENTION:
This procedure requires contact with medium voltage
components. To avoid shock hazards, complete the Power Lockout procedure
on
before servicing the equipment. Verify with a hot stick or
appropriate voltage measuring device that all circuits are voltage free. Failure
to do so may result in severe burns, injury or death.
IMPORTANT
For general information on handling medium voltage controllers and
preparing the installation site, see publication
.
ATTENTION:
Use suitable personal protective equipment (PPE) per local
codes or regulations. Failure to do so may result in severe burns, injury, or
death.
Hardware Size
Tightening Torque Required
1/4 in. (M6)
6 ft•lb (8 N•m)
5/16 in. (M8)
12 ft•lb (16 N•m)
3/8 in. (M10)
20 ft•lb (22 N•m)
1/2 in. (M14)
48 ft•lb (65 N•m)
ATTENTION:
Some components of this product incorporate Imperial
hardware. Rockwell Automation recommends the use of the appropriate
tools to successfully complete the maintenance procedures on these
components. If you cannot obtain such tools, contact your area Rockwell
Automation sales office for assistance.
Содержание Allen-Bradley 7712
Страница 6: ...6 Rockwell Automation Publication 7712 UM001D EN P October 2017 Table of Contents Notes ...
Страница 10: ...10 Rockwell Automation Publication 7712 UM001D EN P October 2017 Preface Notes ...
Страница 14: ...14 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 1 General Information Notes ...
Страница 24: ...24 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 25: ...Rockwell Automation Publication 7712 UM001D EN P October 2017 25 Start up Procedure Chapter 3 ...
Страница 26: ...26 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 3 Start up Procedure ...
Страница 36: ...36 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 4 Equipment Operation Notes ...
Страница 58: ...58 Rockwell Automation Publication 7712 UM001D EN P October 2017 Chapter 5 Maintenance Notes ...
Страница 73: ......