2-2
Installation and Wiring
Power Wiring
Precautions
Terminal Blocks
Terminal R (L1) is not present on single phase drives. Three phase unit terminal
block configuration is depicted in the figure below.
Drive Terminal Blocks
Figure 2.1
ATTENTION:
Remove and lock out power from the drive before
you disconnect or reconnect wires or perform service. Verify bus
voltage by measuring the voltage between DC- and DC+ on Terminal
Block TB2. Do not attempt to service the drive until bus voltage has
discharged to zero volts.
ATTENTION:
The drive is intended to be commanded by control
input signals that will start and stop the motor. A device that routinely
disconnects then reapplies input power to the drive for the purpose of
starting and stopping the motor should not be used. If it is necessary
to use this method for starting and stopping, or if frequent cycling of
power is unavoidable, make sure that it does not occur more than once
a minute.
ATTENTION:
Do not connect power factor correction capacitors to
drive output terminals U, V and W (T1, T2 and T3) or component
damage could occur.
Terminal Block TB3
Control Wiring
TB3
Terminal Block TB2
Ground, Motor
&
Capacitor Module Wiring
TB2
Terminal Block TB1
Ground, Line Power
&
Dynamic Brake Module Wiring
TB1
DC+
W/T3
1
3 4 5 6 7 8 9 10 11
2
V/T2
U/T1
DC–
BR+
T/L3
S/L2
R/L1
BR–
FAULT
READY
Hazardous Voltages
Behind Panel
Содержание Allen-Bradley 160 SSC Series
Страница 12: ...1 6 Getting Started End of Chapter ...
Страница 58: ...5 20 Parameters and Programming End of Chapter ...
Страница 66: ...A 4 Specifications End of Chapter ...
Страница 75: ...Accessories and Dimensions B 9 Drilling Template A Figure B 10 ...
Страница 76: ...B 10 Accessories and Dimensions Drilling Template B Figure B 11 ...
Страница 82: ...C 6 CE Conformity End of Chapter ...
Страница 87: ......