9
PL/CZ/HU/RU/
DE/FR/IT/EN/ES/NL
Instructions for use
These instructions for use must be
carefully read before installation.
Check on content of delivery and condition of the
components
Check delivery after receipt for completeness and
possibly damage (see parts list on page 13). Inform the
dealer immediately when damage is apparent. We are
not liable for damage arising during or after installation/
fitting.
Check door width before starting work
Does the bath pass trough the door of the room in
which the bath will be installed? Required minimum
door width: See dimensions page 12.
Lifting/moving
Always hold bath on rim when lifting/moving - never on
hoses or installation parts.
Laying circuits
Do not lay any circuits under the bath.
Protection from damage
Use suitable protective covers to prevent damage to
surfaces and blockages by dirt or dust arising during
fitting. Cover sensitive components (drain, nozzles,
control panel) temporarily with a protective cover
before starting the installation/fitting.
Special precautions
When cleaning the tiles, make sure that no ammo-
niac or a similar aggressive cleaning agent come into
contact with the installed parts.
Electrical connection (230 V)
Must be performed by a qualified electrician. Fusing via
a FI protective switch (30 mA).
Safety regulations
While installing the bathtub, a series of simple
steps must be followed in order to prevent possible
accidents. The installation must be carried out by
qualified technicians. The bathtub must be connected
to a voltage of 230 V AC at 50 Hz. The appliance must
be supplied through a residual current device (RCD),
having a rated residual operating current that does not
exceed 30 mA. Additionally, the electrical installation
should be equipped with an electrical switch to ensure
all-pole disconnection from the power supply. An
equipotential connection must be made between the
metallic elements of the bath, in accordance with the
corresponding regulations of each country.
Parts containing live components, except parts
supplied with safety extra-low voltage not exceeding
12 V, must be inaccessible to a person in the bath.
Parts incorporating electrical components, except
remote control devices, must be located or
fixed so that they cannot fall into the bath.
Water connection through the
water massage or overflow.
As soon as the water inlet is below
safety device (e.g. a type
A 1 pipe-interrupter with permanent
connection to the atmosphere)
the rim of the tub, the connection
must be made with a safety device
according to EN 1717 (Fluid cate-
gory 5). For example, that might
be a DC
depending
This
connection must absolutely be effected by a qualified
specialist. This is to be observed with:
(a) all tubs filled through the overflow.
(b) all tubs connected and filled through the nozzles
of the water massage of the existing T-fitting. In both
versions, the connection must be made using reinforced
elastic tubing carrying the premixed hot and cold water.
Maximum 20 litres/min (EN 200)
Minimum 36 litres/min (EN 274)
Minimum 48 litres/min (EN 274)
on the installation requirements.
Feed rate:
Overflow rate:
Drainage rate:
Permanent installation
Maintenance hatches of at least 50 x 50 cm are to be
provided so that technical parts (pump, blower, valves,
connection box, other connections) remain accessible.
Removable side panels are ideal and rigid elements are
always to be preferred.
Recommendation: Also provide 20 x 20 cm mainte-
nance hatches for drainage/overflow. Install with sound
insulation.
The installation of a ventilation grill (not supplied) is
absolutely necessary. It is placed in the wall lining, de-
pending upon the model of the tub. To be positioned
near the units.
2
Ventilation grid (min.150 cm ) for air supply to the
blower can be fitted inside the hatch. Maintenance
hatch/ventilation grid can also be put in the adjacent
room.
Recommendation: Install the ventilation grid with
sound insulation. The ventilation grid can also be in the
adjacent room.
If there is not enough space for the
maintenance hatch, we recommend installing the tub
by „applying” it to the surfaces so that, if necessary,
the complete tub can be removed. Ensure that the
drainage pipe, electrical connections and if necessary
the water supply lines can be uncoupled through the
ventilation opening. Seal all round the edge of tub with
silicone (acetic acid-free).
Checking that the tub is waterproof
After connecting the water supply and drainage pipes,
the tub must be filled and examined to ensure that it is
waterproof.
Check the following functions using the controls
1. Air system
2. Water pump
Setting the bath water temperature 40 °C should not be
exceeded.
If space is tight:
General installation instructions
System execution
SMART Water Air
SMART Air
Maximum performance
1,4 kW
SMART Water
GOLD
GOLD opcja
TITANIUM
0,8 kW
0,6 kW
2,1 kW
3,6 kW
3,6 kW
Содержание FANTASY A24T Series
Страница 1: ...FANTASY A24Txxx 0 1850x1150 ...