![Robur GAHP-AR S Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/robur/gahp-ar-s/gahp-ar-s_installation-use-and-maintenance-manual_1471550004.webp)
Introduction
4
I
I
INTRODUCTION
Installation, use and maintenance manual
This Manual is an integral part of the Gitié ARAY unit
and must be handed to the end user together with the
appliance.
I.1
RECIPIENTS
This Manual is intended for:
▶
End user, for appropriate and safe use of the appliance.
▶
Qualified installer, for correct appliance installation.
▶
Planner, for specific information on the appliance.
I.2
CONTROL DEVICE
In order to be able to work, the ARAY unit needs a control device
(DDC or external requests), which must be connected by the
installer.
II
SYMBOLS AND DEFINITIONS
II.1
KEY TO SYMBOLS
DANGER
WARNING
NOTE
PROCEDURE
REFERENCE (to other document)
II.2
TERMS AND DEFINITIONS
Gitié ARAY Appliance / Unit = equivalent terms, both used to
designate the integrated package consisting of a GAHP-AR unit
and a AY00-120 condensing boiler.
GAHP Appliance/Unit = equivalent terms, both used to des-
ignate the gas powered absorption heat pump GAHP (Gas
Absorption Heat Pump).
AY00-120 Boiler / Unit = equivalent terms, both used to desig-
nate the AY00-120 condensing boiler.
TAC = Technical Assistance Centre authorised by Robur.
External enable = generic control device (e.g. thermostat, clock
or any other system) equipped with a voltage-free NO contact
and used as control to start/stop the GAHP/GA unit and the
AY00-120 boiler.
DDC Control (Direct Digital Controller) = optional Robur adjust-
ment device to control one or more Robur appliances (GAHP
heat pumps, GA chillers and AY00-120 boilers) in ON/OFF mode.
RB100/RB200 Devices (Robur Box) = optional interface devices
complementary to DDC, which may be used to broaden its func-
tions (heating/cooling/DHW production service demands, and
control of system components such as third party generators,
adjustment valves, circulators, probes).
Thermal generator = equipment (e.g. boiler, heat pump, etc..)
for heat production for heating and/or DHW.
GUE (Gas Utilization Efficiency) = efficiency index of gas heat
pumps, equal to the ratio between the thermal energy pro-
duced and the energy of the fuel used (relative to LCV, lower
calorific value).
First start-up = appliance commissioning operation which may
only and exclusively be carried out by a TAC.
S61/AR11 Boards = electronic boards on the GAHP unit, to con-
trol all functions and to provide interface with other devices and
with the user.
S70/AY10 Boards = electronic boards on the AY00-120 boiler, to
control all functions and to provide interface with other devices
and with the user.
III
WARNINGS
III.1
GENERAL AND SAFETY WARNINGS
Installer's qualifications
Installation must exclusively be performed by a qualified
firm and by qualified personnel, with specific knowledge
on heating, cooling, electrical systems and gas applianc-
es, in compliance with the laws in force in the Country of
installation.
Declaration of conformity
Upon completing installation, the installing firm shall
issue to the owner/client the appliance's workmanlike
conformity declaration, according to national/local reg-
ulations in force and the manufacturer's instructions/
provisions.
Misuse
The appliance must only be used for the purposes for
which it has been designed. Any other use is deemed
hazardous. Incorrect use may affect operation, duration
and safety of the appliance. Adhere to the manufactur-
er's instructions.
Hazardous situations
Do not start the appliance in hazardous conditions, such
as: gas smell, problems with the plumbing/electrical/gas
system, parts of the appliance under water or damaged,
malfunctioning, disabling or bypassing control and safe-
ty devices.
In case of danger, request intervention by qualified