background image

 

Norm. Tecn. 
60.2.63_04

 

R- CONNECT

 

INSTALLATION

 

 

Date: 

August 2019 

Rev.03 

ENGLISH

 

 

 

 

 

Pag. 1 / 61 

 

 

                            

                                  

Date 

Revisions 

Revision reasons 

Issue 

Cheched by 

Approved by 

07/12/2017 

00 

First Issue 

Baldinini F. 

Baldinini F. 

Baldinini F. 

26/02/2018 

01 

New photo for Robot Master & Bug on connection Robot S6 

Baldinini F. 

Baldinini F. 

Baldinini F. 

23/01/2019 

02 

Index realization and optional film consumption installation 

Baldinini F. 

Baldinini F. 

Baldinini F. 

06/08/2019 

03 

Ecoplat Plus machine 

Baldinini F. 

Baldinini F. 

Baldinini F. 

Содержание R-CONNECT

Страница 1: ...07 12 2017 00 First Issue Baldinini F Baldinini F Baldinini F 26 02 2018 01 New photo for Robot Master Bug on connection Robot S6 Baldinini F Baldinini F Baldinini F 23 01 2019 02 Index realization and optional film consumption installation Baldinini F Baldinini F Baldinini F 06 08 2019 03 Ecoplat Plus machine Baldinini F Baldinini F Baldinini F ...

Страница 2: ...lation procedure Index The R Connect device is possible on THIS MACHINE 5 Starting from July 2017 for the machines of following group A 5 Starting from September 2017 for the machines of following group B 5 Annotation of the IMEI code 6 Insert the SIM CARD A into the DATALOGGER MODULE B 7 ...

Страница 3: ...4 TECHNOPLAT 2000 15 ROBOT S6 16 ROBOT MASTER 17 TECHNOPLAT 3000 18 COMBITECH 19 SPIROR 20 COMPACTA S ORBIT 21 ROTOTECH 3000 22 Electrical CONNECTIONS 23 ECOPLAT PLUS NEW 23 ROTOPLAT series 8 24 TECHNOPLAT CW CS series 8 ROTOTECH TECHNOPLAT 2000 25 ROTARY MASTERPLAT MASTERWRAP 26 CONNECTOR in MASTERPLAT 27 CONNECTOR in MASTERWRAP 28 CONNECTOR in ROTARY 29 ROBOT S6 ROBOT MASTER 30 TECHNOPLAT 3000 3...

Страница 4: ...NOPLAT 3000 SPIROR COMPACTA S ORBIT 39 COMBITECH 40 ROTOTECH 3000 41 ACTIVATION of the device 42 FILM CONSUMPTION INSTALLATION 43 Mechanical Fixing 43 ECOPLAT PLUS NEW 44 MASTERPLAT ROTOPLAT TECHNOPLAT CS CW ROTOPLAT DW DWC 46 ROTARY ROTOTECH 48 ROBOT S6 49 ROBOT MASTER 50 Important NOTE Carriages NOT mentioned 51 Electrical CONNECTIONS 52 ECOPLAT PLUS NEW 52 MASTERPLAT ROTOPLAT TECHNOPLAT CS CW R...

Страница 5: ... produced Starting from July 2017 for the machines of following group A Technoplat 2000 Masterplat Masterwrap Rotoplat series 8 Rotary Rototech Technoplat CW CS series 8 Robot S6 Robot Master Ecoplat PLUS NEW Starting from September 2017 for the machines of following group B Technoplat 3000 Combitech Spiror Orbit Compacta S Rototech 3000 MODULE Z UMTS MODULE Z PASS2 ...

Страница 6: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 6 61 Annotation of the IMEI code Write down the IMEI code you will then need to communicate this CODE to activate the module ...

Страница 7: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 7 61 Insert the SIM CARD A into the DATALOGGER MODULE B A B ...

Страница 8: ...9 Rev 03 ENGLISH Pag 8 61 Mechanical fixing of the DATALOGGER MODULE and of the ANTENNA on the machine The mechanical fixing of the device on the machine is similar on all machines the typical group of components is like the one shown below ...

Страница 9: ...ATION Date August 2019 Rev 03 ENGLISH Pag 9 61 The ANTENNA MODULE connection is made by CABLE on all machines except than in ROBOTS where ANTENNA is DIRECTLY mounted on the module Connection with cable Direct connection ...

Страница 10: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 10 61 ECOPLAT PLUS NEW ANTENNA MODULE ...

Страница 11: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 11 61 MASTERPLAT ROTOPLAT serie 8 ANTENNA MODULE ...

Страница 12: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 12 61 TECHNOPLAT CW CS serie 8 ANTENNA MODULE ...

Страница 13: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 13 61 MASTERWRAP MODULE ANTENNA ...

Страница 14: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 14 61 ROTARY ROTOTECH ANTENNA MODULE ROTARY MODULE ROTOTECH ...

Страница 15: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 15 61 TECHNOPLAT 2000 ANTENNA MODULE ...

Страница 16: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 16 61 ROBOT S6 MODULE With ANTENNA ...

Страница 17: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 17 61 ROBOT MASTER MODULE With ANTENNA ...

Страница 18: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 18 61 TECHNOPLAT 3000 MODULE ANTENNA ...

Страница 19: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 19 61 COMBITECH MODULE ANTENNA ...

Страница 20: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 20 61 SPIROR ANTENNA MODULE ...

Страница 21: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 21 61 COMPACTA S ORBIT MODULE ANTENNA ...

Страница 22: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 22 61 ROTOTECH 3000 MODULE ANTENNA ...

Страница 23: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 23 61 Electrical CONNECTIONS ECOPLAT PLUS NEW ...

Страница 24: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 24 61 ROTOPLAT series 8 ...

Страница 25: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 25 61 TECHNOPLAT CW CS series 8 ROTOTECH TECHNOPLAT 2000 ...

Страница 26: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 26 61 ROTARY MASTERPLAT MASTERWRAP ...

Страница 27: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 27 61 CONNECTOR in MASTERPLAT ...

Страница 28: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 28 61 CONNECTOR in MASTERWRAP ...

Страница 29: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 29 61 CONNECTOR in ROTARY ...

Страница 30: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 30 61 ROBOT S6 ROBOT MASTER ...

Страница 31: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 31 61 TECHNOPLAT 3000 ...

Страница 32: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 32 61 SPIROR COMPACTA S ORBIT COMBITECH ...

Страница 33: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 33 61 Power supply CONNECTOR possible different positions ...

Страница 34: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 34 61 ROTOTECH 3000 ...

Страница 35: ...lighting of the RESET button lamp light 4 Simultaneously press the ROTATION SPEED 2 ROTATION SPEED 2 and the RESET button 4 The lamp of the START button starts flashing slowly light 3 Pressing the START button 3 starts the activation procedure During this phase the RESET button 4 will flash quickly until it becomes steady when the procedure is complete By pressing the RESET button 4 the machine wi...

Страница 36: ...mode turn on the machine keeping pressed the jog the display will show P1 then press the jog till you reach RCR and press the START button Wait for all four LEDs to light up in the top line of the display At this point the procedure is deemed to have ended Pressing the JOG returns to the value D1 By pressing the STOP button the machine will go to the RESET status 4 LEDS ...

Страница 37: ...eries 8 TECHNOPLAT CW CS series 8 ROTARY ROTOTECH TECHNOPLAT 2000 ROBOT S6 check that the FW Release and GSM FIELD have values other than 0 Check that the LED at the top next to the Rconnect logo is GREEN Modbus OK Press the REGISTER button and wait until all 4 LEDS are green ...

Страница 38: ...ON Date August 2019 Rev 03 ENGLISH Pag 38 61 MASTERPLAT ROBOT MASTER MASTERWRAP Turn the jog to show TEST push the jog WAIT will be displayed With 4 green signals the device website comunication is OK To exit press the jog ...

Страница 39: ...te August 2019 Rev 03 ENGLISH Pag 39 61 TECHNOPLAT 3000 SPIROR COMPACTA S ORBIT Check the fileld APP VERSION and GSM Signal to have values greater than 0 Press the REGISTER button Wait the confirm green icon V to be displayed V ...

Страница 40: ...INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 40 61 COMBITECH Check the fileld SW Release and GSM signal to have values greater than 0 Press the REGISTER button Wait the confirm green icon V to be displayed V ...

Страница 41: ...NSTALLATION Date August 2019 Rev 03 ENGLISH Pag 41 61 ROTOTECH 3000 V Check the fileld FW Release and GSM Field to have values greater than 0 Press the REGISTER button Wait the confirm green icon V to be displayed ...

Страница 42: ... ENGLISH Pag 42 61 ACTIVATION of the device For the final activation of the R Connect device ONLY WRITE an EMAIL to activation machinery rconnect robopac com containing Machine serial number IMEI code of the device previously noted ICCID of the Sim ...

Страница 43: ...uding the ROLL and the SENSOR see below S This sensor has to be mounted with a distance of 2 3 millimeters from the PLATE see below P After mounting the sensor check that Moving the ROLL PLATE the sensor has always to be ON light on in front of the section WITH METAL Moving the ROLL PLATE the sensor has always to be OFF light off in front of the section WITHOUT METAL S P ...

Страница 44: ...TION Date August 2019 Rev 03 ENGLISH Pag 44 61 Let s now check different mounting informations for the different machine models ECOPLAT PLUS NEW The new roll has to be MOUNTED at the place of a free roll on the carriage ...

Страница 45: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 45 61 Some details Bottom Top ...

Страница 46: ... ENGLISH Pag 46 61 MASTERPLAT ROTOPLAT TECHNOPLAT CS CW ROTOPLAT DW DWC The new roll has to MOUNTED at the place of the carriage emergency roll see below R the SENSOR can be mounted on two different available holes different for different carriages ...

Страница 47: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 47 61 ...

Страница 48: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 48 61 ROTARY ROTOTECH The new roll has to be MOUNTED at the place of a free roll on the carriage ...

Страница 49: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 49 61 ROBOT S6 The new roll has to be MOUNTED at the place of a free roll on the carriage ...

Страница 50: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 50 61 ROBOT MASTER The new roll has to be MOUNTED at the place of a free roll on the carriage ...

Страница 51: ...TE Carriages NOT mentioned In the case of carriages not mentioned on this document to know witout doubt what is the roll to eliminate to place the new film consumption roll it s only necessary to find the ROLL with the HOLE for the SENSOR on the carriage as on the example below ...

Страница 52: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 52 61 Electrical CONNECTIONS ECOPLAT PLUS NEW The film consumption sensor has to be connected to the INPUT 13 of the R CONNECT module ...

Страница 53: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 53 61 MASTERPLAT ROTOPLAT TECHNOPLAT CS CW ROTOPLAT DW DWC ...

Страница 54: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 54 61 ...

Страница 55: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 55 61 ...

Страница 56: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 56 61 MASTERWRAP ...

Страница 57: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 57 61 ROTARY ROTOTECH ...

Страница 58: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 58 61 ROBOT MASTER ROBOT S6 ...

Страница 59: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 59 61 ...

Страница 60: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 60 61 ...

Страница 61: ...R CONNECT INSTALLATION Date August 2019 Rev 03 ENGLISH Pag 61 61 ...

Отзывы: