Robinson Polytunnels 6ft Wide Polytunnel Скачать руководство пользователя страница 1

 

 

 

 

 

 

 
 
 
 
 

 

 

Содержание 6ft Wide Polytunnel

Страница 1: ......

Страница 2: ...B Ground Anchor Plates 4 3 FOUNDATION TUBES Option C Concreted Foundation Tubes 5 4 STEEL FRAME ASSEMBLY INSTALLATION 6 5 TIMBER END FRAME ASSEMBLY INSTALLATION 8 6 TIMBER BASE RAIL OPTION 9 7 FITTING THE ANTI HOT SPOT TAPE 11 8 FITTING THE POLYTHENE TRENCHING METHOD 12 9 FITTING THE POLYTHENE POLYTHENE TO BASE RAIL 14 10 DOOR ASSEMBLY INSTALLATION 16 PARTS LIST 18 POLYTUNNEL MAINTENANCE 21 ...

Страница 3: ...spanners or sockets Tape measure Scissors or craft knife 1 FOUNDATION TUBES Option A Hammered In Foundation Tubes Suitable for trenched polythene only 1 Set two string lines to the width of the polytunnel 6ft apart Ensure they are parallel Tip It s best to put your polytunnel on a flat level site A fall lengthways is easy to accommodate A fall sideways should be limited to about 6 over the width o...

Страница 4: ...anchor plates onto the bottom end of the Foundation Tubes And lock in place with the Starlock Washers Starlock Washers are inserted using the short piece of tube a With the foundation tube upside down slot the 6mm Concrete Tie Bar steel rod into the pre punched hole in the Foundation Tube b Slot the Ground Anchor Plate onto the bottom end of the Foundation Tube to rest on the Concrete Tie Bar c Ho...

Страница 5: ...tring lines 3 Mark the ground at each foundation position to the outside of the length string lines at 5ft centres until the full length is reached 4 Temporarily remove the string lines so they don t get in the way whilst digging 5 Dig a hole for each foundation tube approximately 25cm square x 35cm deep 6 Reinstate the string lines 7 Fill the excavated holes with freshly mixed concrete 8 Put a st...

Страница 6: ...oops together with the E25 fitting 3 Slot a KH20 fitting over the second foundation tube from each end of the polytunnel This is to hold the bottom end of the corner diagonal 4 OPTION If you have ordered the Base Rail Option slide an M20 25 fitting over each corner foundation tube 5 Put an A20 fitting onto each foundation tube On the corner foundation tubes set the A20 fitting to about 18cm above ...

Страница 7: ...and tighten the bolt to secure in place 9 Slot a swaged ridge tube into the end of the previous ridge tube until you reach the end of the polytunnel Tighten the bolts in the E25 fittings to secure the ridge tubes in place 10 Insert a plastic plug into each end of the ridge tube 11 Fit the four corner diagonals Fix to the KH20 fitting on the foundation tube first using an M8 x 30 bolt nylock nut Th...

Страница 8: ...uild the End Frame around it 4 Nail a temporary batten across the door posts at 183cm below the lintel This will rest on the ground when you are installing the Timber End Frame and set the lintel to the correct height 5 Dig two holes for the door posts at each end of the polytunnel approximately 55cm deep 6 Slot the door posts into the excavated holes and set the end frame vertical in both directi...

Страница 9: ...they are long enough 4 Bolt the timber to the M20 fitting with an M8 x 50 coach bolt and nut 5 Using a flat nail plate fix the timber to the door post with 30mm long twist nails Nail through the door post into the end of the timber with a 125mm long nail 6 Lay the next timber along the side of the polytunnel flush with the outside of the timber base rail on the end of the polytunnel Mark through t...

Страница 10: ...with a timber joint plate and 30mm long twist nails 11 Check that the timber base rail is straight and adjust the SC20 fittings if necessary 12 If you are fixing the main cover to the base rail create a rebate around the Timber End Frame and along the base rail for fixing the polythene Use battens 38mm x 19mm and 50mm long nails about 15cm apart ...

Страница 11: ...ve the A20 fitting on the foundation tube place the Anti Hot Spot Tape on the outside face of the hoop On the inner hoops the tape should be central on the tube On the end hoops the tape should be on the corner of the tube Tip Don t fit the Anti Hot Spot Tape until you re ready to sheet it may get damaged if the weather is wet and windy 3 Tape over any sharp edges bolt heads and metal faces that t...

Страница 12: ...d unfold the polythene and drape it over the polytunnel framework with an equal amount over each side and each end 3 Carefully slice the polythene diagonally from the top corners of the doorway Trim the bottom off the central flap so that it hangs approximately 30cm below the door lintel 4 Use a full batten to fit in the rebate above the doorway 5 Place the batten underneath the flap of polythene ...

Страница 13: ...w fix the polythene to the door posts The polythene is pulled into the doorway and pleated Trap the polythene behind the batten as you nail the batten into the rebate Use nails 50mm long at about 10cm apart Tip Pre nail the battens so they re ready to fix the polythene quickly Tip Fold the pleats downwards so that they don t collect rainwater 9 Trim off the surplus polythene in the doorway Tip To ...

Страница 14: ...the rebate Nail the batten in place Note it is preferable to have a couple of small pleats in the flap of polythene 4 Repeat at the other end PULLING THE POLYTHENE AS TIGHT AS POSSIBLE 5 Starting at the centre of one side batten the polythene to the base rail Hold the batten under the edge of the polythene and carefully cut the polythene in line with the ends of the batten to create a flap up to t...

Страница 15: ...e polythene is pulled into the doorway and pleated Trap the polythene behind the batten as you nail the batten into the rebate Use nails 50mm long at about 10cm apart Tip Fold the pleats downwards so that they don t collect rainwater Tip Pre nail the battens so they re ready to fix the polythene quickly 11 Trim off the surplus polythene in the doorway 12 Raise the inner hoops to tension the polyth...

Страница 16: ... the triangles approximately 5mm from the edge of the door 4 Stand the door on its side and nail through the door verticals into the ends of the door horizontals with the 75mm nails 5 For cladding each door you will need a 3 battens at 38mm x 19mm x 846mm cut to length b 4 battens at 38mm x 19mm x 858mm cut to length c Piece of door polythene 1m x 1m d Piece of door net 1m x 1m e 63 nails 50mm lon...

Страница 17: ... Position the door with the end frame resting on packing pieces to set the gap around the door Screw the hinges to the door post 12 Screw the auto gate latch and latching bar to the door post and door vertical respectively 13 Drill a hole through the door post for the pull string The polyester cord pull string is tied around the sneck of the gate latch threaded through the hole and a loop tied on ...

Страница 18: ...6ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 18 PARTS LIST ...

Страница 19: ...6ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 19 PARTS LIST continued ...

Страница 20: ...6ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 20 PARTS LIST continued ...

Страница 21: ...when applying the Repair Tape If possible apply the Repair Tape to both sides of the polythene Always use sharp scissors when cutting the Repair Tape 3 Major damage to the polythene cover will require a complete replacement polythene cover 4 When replacing the polytunnel cover check the Anti Hot Spot Tape for degradation and de lamination of the friction free surface Replace the Anti Hot Spot if n...