12.2 BACnet MS/TP
BACnet MS/TP
is a token passing protocol. MS
stands for Master-Slave and the TP stands for Token
Passing.
Each controller on the network has the ability
to
hear the broadcast of any other device on the
network.
The speed of an MS/TP network ranges from 9600
bps to 76.8 kbps. There are two different ways to
connect I/O Pro 812u to BACnet MS/TP.
12.2.1 To set up the Modulating Controller for
BACnet MS/TP on
Port 1
1. Turn off power to control board.
2. Using the rotary switches, set the controller's
address.
.
3. Set the Dip switches 4 and 5 for the proper com-
munication speed. (baud rate).
4. Set the DIP switch number 3 off.
5. Set the DIP switches number 6, 7 and 8 off.
6. Connect the communication cable to Port 1, (be
careful for polarity).
7. Set the Port 1, jumper to 485 setting.
Note
• A dedicated 24 AWG to 18 AWG twisted pair wire
(EIA-485)
• 2000’ (610 m) for 76.8 kbps
• 3000’ (914.4 m) for 9600 bps, 19.2 or 38.4 kbps,
before needing a Repeater
• Devices should be daisy chained and not star
wired
• If the controller is at either end of a network seg-
ment, connect a BT485 Terminating Resistor (P/N
10061018) to the I/O Pro 812u.
• Use the same polarity throughout the network
segment.
8. Turn on power to control board.
9. Set the correct network number to the unique
BACnet MS/TP network on the touch screen.
10. Set the unique BACnet Device Instance number
on touch screen.
12.2.2 To set up the Modulating Controller for
BACnet MS/TP on
Port 2a
1. Turn off power to control board.
2. Using the rotary switches, set the controller's
address.
.
3. Set the Dip switches 4 and 5 for the proper com-
munication speed (baud rate).
4. Set the DIP switch number 3 on for port 2a.
5. Set the DIP switches number 6, 7 and 8 off.
6. Connect the communication cable to Port 2a, (be
careful about Polarity).
Содержание CORAYVAC
Страница 2: ......
Страница 4: ......
Страница 69: ...SECTION 8 PROGRAMMING AND TROUBLESHOOTING THE SYSTEM 65 THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 71: ...SECTION 9 TROUBLESHOOTING 67 FIGURE 26 Vacuum pump does not turn on ...
Страница 73: ...SECTION 9 TROUBLESHOOTING 69 FIGURE 28 VFD showing a fault sign FIGURE 29 VFD input power issue ...
Страница 75: ...SECTION 9 TROUBLESHOOTING 71 FIGURE 31 Burner troubleshooting in manual mode ...
Страница 77: ...SECTION 9 TROUBLESHOOTING 73 After 45 second prepurge burners do not light continued ...
Страница 79: ...SECTION 9 TROUBLESHOOTING 75 FIGURE 34 APS does not close within 60 seconds after VFD receives run command ...
Страница 81: ...SECTION 9 TROUBLESHOOTING 77 FIGURE 36 Air Pressure Switch alarm ...
Страница 83: ...SECTION 9 TROUBLESHOOTING 79 FIGURE 38 Repeater troubleshooting ...
Страница 85: ...SECTION 9 TROUBLESHOOTING 81 BACnet MS TP troubleshooting continued ...
Страница 109: ...SECTION 13 TOUCHSCREEN TREE 105 Touchscreen Tree Overview continued ...
Страница 111: ...SECTION 13 TOUCHSCREEN TREE 107 FIGURE 47 Maintenance Unit FIGURE 48 Alarms ...
Страница 113: ...SECTION 13 TOUCHSCREEN TREE 109 FIGURE 51 Configuration Zones FIGURE 52 Configuration Unit ...
Страница 115: ...SECTION 13 TOUCHSCREEN TREE 111 FIGURE 55 Touchscreen System FIGURE 56 Touchscreen Setup ...
Страница 118: ...ROBERTS GORDON CORAYVAC MODULATING HEATING CONTROL CONTROLLER INSTALLATION MANUAL 114 ...
Страница 119: ...SECTION 14 THE ROBERTS GORDON CORAYVAC COMPLETE MODULATING HEATING CONTROL LIMITED WARRANTY 115 ...