HED-S
ERIES
I
NSTALLATION
, O
PERATION
AND
S
ERVICE
M
ANUAL
50
10.7 Internal Wirin
g
10.
8
Ladder Dia
g
ram
IGNITER
POWER SUPPLY
FLAME SENSE
120V 60 HZ
L1
L2
GAS
VALVE
GRN
BLK
WHT
MOTOR/BLOWER
GRN
BLK
BLK
BLK
BUSHING
TERMINAL
3
1
4
5
TRANSFORMER
BLK
GRN
IGNITION
MODULE
YEL
BRN
BLUE
YEL
BLUE
YEL
WHT BLK
PRESSURE SWITCH
PLUG
3 1
R1
R1
YEL
BLUE
THERMOSTAT
TO
BURNER ON LED
TH
C1
V1
C2
S1
V2
GND
120VAC
R1
120VAC
24VAC
RELAY
24V
PRESSURE
TH
V2
S1
SPARK
C2
TRANSFORMER
(L1)
GND
(L2)
SWITCH
THERMOSTAT
BLOWER
LINE
NUETRAL
R1
ELECTRODE
GAP
BURNER ON
GAS VALVE
Содержание COMPLETE HED Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 24: ...HED SERIES INSTALLATION OPERATION AND SERVICE MANUAL 18 FIGURE 17 Linear Heater Assembly Overview ...
Страница 25: ...SECTION 6 HEATER INSTALLATION 19 FIGURE 18 Linear Heater Layout Overview ...
Страница 35: ...SECTION 7 OPTIONAL HEATER ACCESSORIES 29 FIGURE 21 U Tube Heater Layout Overview ...
Страница 62: ...HED SERIES INSTALLATION OPERATION AND SERVICE MANUAL 56 ...
Страница 63: ...SECTION12 TROUBLESHOOTING 57 12 2 Manifold Gas Pressure Setting ...
Страница 68: ......
Страница 69: ...2017 ...
Страница 70: ......
Страница 71: ......
Страница 72: ......