8
PREPARING FOR INITIAL START-UP
Before conveyor start-up, all operators and
other personnel coming in contact with unit
must be properly trained and must have
read accompanying Tech Handbook.
Provisions must be in order to instruct all
personnel coming in contact with conveyor
on the location of emergency stops,
pull cords, etc.
A routine maintenance program should
be implemented before unit is placed
into operation so that fundamental
unit components are attended to. This
maintenance program should include an
inspection to ensure that any dangerous or
hazardous operating conditions are noted
and IMMEDIATELY corrected, as well as
including electrical and mechanical unit
inspections and corrections.
Finally, when conveyor is initially started,
an immediate visual inspection should
include motor, gear reducer, belt tracking
(discussed in following section under “Belt
Tracking”) and related adjustments noted in
handbook for unit/component corrections.
WARN ALL PERSONNEL TO KEEP CLEAR OF
CONVEYOR DURING UNIT START-UP
Electrical controls must be designed by
a qualified electrical engineer to ensure
that appropriate safety features (emer-
gency stops, pull cords, switches, etc.)
are installed on unit for safe operation.
Before conveyor start-up, all operators
and other personnel coming in contact
with unit must be properly trained and
must have read accompanying Tech
Handbook.
PosiVent
Unique design incorporates a single seam
construction. Factory filled with
synthetic lubrication for universal mounting. Lubed
for life, no oil changes are required.
To expedite the installation and start-up process, all gear red ucers are shipped filled with oil. The reducers are sealed and
lubed for life and require no oil changes.