
Product Manual | Lynx™ Strain Gage Button Sensors LS‑B‑127‑50/125/500/2000
RJG, Inc.
43
SENSOR INSTALLATION CHECK—CLAMP PLATE (HEAD‑TO‑HEAD) INSTALLATION
(
continued
)
POST‑ASSEMBLY CHECKS
Verify that the each sensor, transfer pin, and ejector pin pocket is machined correctly.
1.
Protrusion Test (without sensor)
With the ejector and transfer pins installed, the ejector plate in injection position, and the ejector
plate fixed towards clamp plate, press the ejector and transfer pin together, towards the cavity; the
ejector pin should protrude 0.008–0.01” (0,2–0,3 mm).
Ejector
Retainer
Plate
Clamp
Plate
Ejector
Plate
B Plate
or
Cavity
Insert
Ejector Pin
Transfer Pin
Содержание Lynx LS-B-127-125
Страница 2: ...PRINT DATE 07 21 2020 REVISION NO 0...
Страница 6: ...Lynx Strain Gage Button Sensors LS B 127 50 125 500 2000 Product Manual iv RJG Inc...
Страница 8: ...Lynx Strain Gage Button Sensors LS B 127 50 125 500 2000 Product Manual vi RJG Inc...
Страница 14: ...Lynx Strain Gage Button Sensors LS B 127 50 125 500 2000 Product Manual 6 RJG Inc...
Страница 58: ...Lynx Strain Gage Button Sensors LS B 127 50 125 500 2000 Product Manual 50 RJG Inc...
Страница 65: ......