Riverside
FURNITURE
email: [email protected]
Coventry
Home Office
Assembly Instructions
Made in China
Page 1 of 5
1 pc.
Wood Screw
6 x 16mm
2 pcs.
2 pcs.
The two lights in the top of the Hutch are controlled with a three-stage touch-switch connected
to the top hinge on the Left-Hand door. After connecting the power cord to a wall outlet, t he
first three touches bring the light to low, medium, and high brightness. Touching the fourth
time will turn the light off.
RISK OF FIRE / INJURY / BURN TO PERSONS / PROPERTY. KEEP
COMBUSTIBLES AWAY FROM LIGHTING FIXTURE. TURN OFF /
UNPLUG TO CHANGE BULB. DO NOT TOUCH HOT BULB. DO
NOT OPERATE LIGHT IF DAMAGED.
The task light located underneath the center
shelf is controlled with a rotary switch at
the end of the fixture.
After attaching the Hutch on top of
the Credenza, install the Shelf Pins
(C) in the desired level of holes and
place the Glass Shelves on the Pins.