32 | Installing and Configuring the SteelHead
Powering on the system
2. Plug the AC power cord into the SteelHead.
Note:
If your model has multiple power supplies, you must plug in all the power cords or you will hear an alarm.
Figure 3-4. Connecting the AC power
3. Plug the AC power cord into an uninterrupted AC power source.
4. Press the system power switch on. If the SteelHead doesn’t immediately power on, press the power
switch off, then press the power switch on again.
5. Check the status lights on the SteelHead. For detailed information about the status lights, see the
appendixes that follow.
Note:
The SteelHead CX (Series xx55) takes approximately 10 minutes to boot.
Securing the power cord on desktop systems
The CX 255 models include a power cord retention module. You can install this module to reduce the
risk of accidentally unplugging the power.
To install the power cord retention module
1. Push the retention module into the socket near the power connection.
The socket is located to the left of the power supply.
Содержание SteelHead 5080
Страница 10: ...10 Welcome Contacting Riverbed...
Страница 16: ...16 Riverbed Software Licenses Upgrades and Image Signing Software upgrades and image signing...
Страница 60: ...60 Troubleshooting Network integration checklist...
Страница 90: ...90 CX x70 Desktop Appliance Specifications CX 570 and CX 770 specifications...
Страница 94: ...94 CX x55 Appliance Specifications CX 255 specifications...