1.1.  The  boilers  of  the  UNIVERSAL  RG  series  are  a  part  of  the  heating  system  and  are  produced  in 

accordance with EN 303-5: 2012 TC 4931-007-82749029-2007, TC 4931-008-82749029-2007. 

1.2. The boiler works on solid fuel (coal, firewood, sawdust, pellets, combustible waste, etc.) and does not 

require the constant staff presence. Manual fuel loading is performed 2–4 times a day, as necessary. The boiler 
is  economical  in  its  operation;  its  efficiency  is  up  to  80%.  Efficiency  can  be  increased  by  installing  an 
economizer. 

1.3. When installing multiple boilers (energy module), the total heat output increases proportionally. Any 

number of boilers is allowed for installation into modules. 

1.4. When installing additional equipment, you can get hot water for household and domestic needs. 

1.5. To simplify maintenance and repair, the boiler has a detachable construction made of two parts: a heat 

exchanger and an ashpit. Cleaning the boiler from the ash is made without stopping it. 

1.6. In standard package, the boiler comes with a heat-insulating casing. Thermal insulation of the boiler 

and  pipelines  significantly  reduces  heat  loss  in  the  heating  system  and  protects  the  staff  from  the  effects  of 
elevated  temperature  of  the  heated  parts.  Thermal  insulation  of  pipelines  is  made  of  affordable  thermal 
insulating materials (mineral wool, etc.). 

1.7. As a rule, the boiler is installed directly in the vicinity of the heated facility or directly on the facility 

(when a height of the boiler plant is at least 2.8 m). When installing the boiler outside the insulated room, the 
insulation of the boiler, as well as of all pipelines, is required in case of emergency shutdown in order to avoid 
unnecessary heat loss and rapid freezing of the system. 

1.8. Maintenance, proper operation and preventive cleaning of the boiler, the gas flue, the chimney and the 

heating system is carried out by the owner of the boiler. 

1.9. CO emission is less than 0.7%. 

1.10. The  boilers  of  the  UNIVERSAL  RG  series  are  not  subject to registration  in supervisory  authorities 

when operating in low-pressure heating systems with a heat exchange liquid temperature less than 100 °C. 

 

2. Purpose 

2.1. The boilers of the UNIVERSAL RG series  are intended for heating and hot water supply  of residential, 
office and production facilities, buildings, shops, etc. 

 

3. Completeness 

3.1. The standard package includes: 

 

boiler – 1 pc; 

 

safety devices (thermometer – 1 pc, monometer – 1 pc, safety valve – 1 pc, automatic air vent – 1 pc); 

 

installation and operation instruction; 

 

product passport with warranty obligations – 1 pc; 

 

the platform,  the scoop, and the scraper are not included into the standard package and  are completed 
separately at the client’s request. 

 

4. Technical specification 

4.1. Heat transfer liquid is water and special non-freezing liquids. 

Temperature condition of the heat transfer liquid: 

Maximum – 75

С – 65

С (flow – return flow). 

Optimum – 75

С – 60

С. 

Содержание UNIVERSAL RG Series

Страница 1: ...assport data and the boiler you have purchased which do not affect its technical characteristics and consumer properties When purchasing a boiler check the completeness appearance of the product and t...

Страница 2: ...ek ee The warranty period of the boiler manufactured in accordance with EN 303 5 2012 GOST 20548 TC 4931 007 82749029 2007 is 24 months from the date of sale via a retail network The warranty period f...

Страница 3: ...E 8 6 4 HEATING SYSTEM INSTALLATION 8 6 5 THE BOILER IGNITION PROCEDURE 8 6 6 BOILER SHUTDOWN PROCEDURE 9 6 7 BOILER OPERATION 9 7 SYSTEM TESTING SAFETY DEVICES 10 8 SAFETY RULES FOR INSTALLATION MAIN...

Страница 4: ...etc 1 7 As a rule the boiler is installed directly in the vicinity of the heated facility or directly on the facility when a height of the boiler plant is at least 2 8 m When installing the boiler ou...

Страница 5: ...layer which virtually eliminates the formation of carbon monoxide and provides the boiler with efficiency of up to 84 when operating in optimal mode 4 6 The average seasonal fuel consumption calorific...

Страница 6: ...ried out on the operating boiler by shaking grates 20 fixed on rotating shafts using two arms 17 located on the front part of the ashpit Ash and unburned particles of coal pour down into the ashpit 20...

Страница 7: ...several boilers are installed inside one boiler plant the boilers are connected to the heating system through a supply and return manifold mounted between the boilers and the wall of the boiler plant...

Страница 8: ...recommended to fill the system with soft water that does not contain salts and other impurities which being deposited on the walls of pipes and jacket of the boiler impair heat transfer and their effi...

Страница 9: ...uid or circulation along a small or one of the heating system circuits due to its unregulated or obstructed pipes etc 6 6 3 Emergency shutdown of the boiler is performed as follows Tightly close the a...

Страница 10: ...ashpit junction with the heat exchanger are carefully sealed with fireproof gaskets and cords 6 7 10 The boiler s construction allows its cleaning from rocks and large pieces of ash as they accumulat...

Страница 11: ...3 The boiler is fireproof The temperature of its outer surfaces does not exceed the normalized values but during its operation the gas flue pipes and chimney are heated to a high temperature In order...

Страница 12: ...y walls the presence of foreign objects in the chimney very fine coal dust coal is used low quality fuel is used a large amount of ash on the grates or in the ashpit fuel stall in the bunker Clean the...

Страница 13: ...pacity It is recommended to carry out preventive cleaning of the boiler heat exchanger every 2 months 11 4 The heat exchanger cleaning is done by pulling the upper removable part of the bunker 13 by i...

Страница 14: ...of steam and hot water boilers with a steam pressure of no more than 3 kgf cm2 hot water boilers water heaters with water heating temperature not higher than 75 EN 303 5 2012 GOST 20548 TC 4931 007 8...

Страница 15: ...echnical operation Date The result of the examination Date of the next examination Signature of the person responsible 6 1 Registration The UNIVERSAL RG boiler______________________ water heating is r...

Страница 16: ...e boiler into operation Repeated call in a specialist is paid by the buyer Terms of warranty validity Acceptance of the boiler into operation should be carried out only with the participation of an au...

Страница 17: ...a i ja ekspluateerimisreeglite rikkumine v ib ajendada tarbimisomaduste alandust v i t rge ja sama garanteerimisremonti iguse kaotamine Tehas tegija sama teeb t iendava seadmete hange mis pole l litat...

Страница 18: ...kuud ekspluatatsioonip eva sisse l litamiseks vaid mitte rohkem kui 24 kuud m gip evast Palume Teid j rgida alltoodud n udmisi ja k igepealt igaaastase kontrolli l biviimist ja spetsialiseeritud orga...

Страница 19: ...P LETAMISE KORD 8 6 5 KATLI PEATAMISE KORD 8 6 6 KATLI EKSPLUATEERIMINE 9 7 S STEEMI KATSED KAITSEVAHENDEID 9 8 MONTAA I TEENINDAMISE JA EKSPLUATEERIMISE OHUTUSREEGLID 10 9 KATLI T KORRASTUSED JA NEND...

Страница 20: ...liruumise k rgel mitte v hem kui 2 8 m Katli installeerimine soojustatud ruumi v ljaspool katli soojusisoleerimine ja sama k ikide torustiku igustamata soojukaotamise ja kiire s steemi mberk lmetamise...

Страница 21: ...ub ruumide soojustusest 5 Koostis ja t p him tted Katli skeem on toodud Joones 1 1 Tuhakasti uks 12 Bunkri alamosa mahav tmise k epidemed 2 huservi regulaator 13 lem mahav tmise bunkri osa 3 P letamis...

Страница 22: ...EN 303 5 2012 k esoleva juhend ja katli pass 3 kgs ruutsm veesoojuskatlite ja veesoojuste mis veetemperatuur mitte k rgem kui 85C seadme reeglid Kuuma vee ja auru torustiku ohutu ekspluatatsiooni sea...

Страница 23: ...ti ukse kaudu ilma soojusvahetuste demontaa iga kui ka tuhakasti leval p rast soojusvahetuse demontaa i 6 3 2 Tehas tegijaga katli omanike n udega tehakse remondikomplektede toomine tuharestide vahe t...

Страница 24: ...huservi regulaator kinni 2 ja avame alam huetteanne regulaator 4 teeme katsete kaudu l tku veetemperatuur ei pea letama 75 kraadi 6 6 Katli peatamise kord 6 6 1 J rguline katli peatamine toimub 1 p e...

Страница 25: ...e huimejate eemaldamisega gaasiteedel gaasikogus ja suitsuk ijal suitsutorul j tkukoha kvaliteetse keevitamise arvelt Imimese v ltimiseks suitsuteede puhastamisluuk gaasitee risisestus konomaaiser ja...

Страница 26: ...ise leva k va taldatega jalatsitega 8 5 N op letuse v ltimiseks on keelatud katli katust v lja v tta levaade v i k tuse bunkrisse allalaadimise tuhakasti avatud uksega 8 6 On keelatud kasutada p letav...

Страница 27: ...s tekkib tahmi ja t rvu mis alandab soojusvahetust ja tema j udsus Soovitatakse ks kord 2 kuu p rast teha profilakteerimis katlipuhastust soojusvahendus 11 4 Soojusvahenduse puhastamine toimub lema pu...

Страница 28: ...haseline ___________ on tehtud vastavalt n udmisele Seadme reeglid ja ohutu auru ja veesojendamise aurur huga mitte rohkem kui 3 kgs cm2 veesoojendamiskatlid veesojendajad veesojenda temperatuuri mitt...

Страница 29: ...kontrolli mise kuup eav Allkiri 5 2 Tehnilise ekspluatatsiooni ja korraliku seisundi vastutav isik Kuup ev Tunnustamise tulemus J rgmise tunnustamise kuup ev Vastutava isiku allkiri 6 1 Registreerumi...

Страница 30: ...se eest maksab ostja Garantiikohustuse kehtestumise tingimused Katli ekspluatatsioonisse v tmine peab olema tehtud ainult vastava spetsialisti osalemisega Katli ekspluateerimisel on kohustuslik igaaas...

Страница 31: ...UNIVERSAL RG EN 303 5 2012 4931 007 82749029 2007 4931 008 82749029 2007 www Ritek ee...

Страница 32: ...2 EN 303 5 2012 20548 4931 007 82749029 2007 24 EN 303 5 2012 30735 2001 4931 008 82749029 2007 18 24...

Страница 33: ...3 1 4 2 4 4 5 5 5 6 6 6 1 6 6 2 7 6 3 7 6 4 8 6 5 9 6 6 9 7 10 8 11 9 11 10 12 11 13 12 14...

Страница 34: ...1 UNIVERSAL RG EN 303 5 2012 4931 007 82749029 2007 4931 008 82749029 2007 1 2 2 4 80 1 3 1 4 1 5 1 6 1 7 2 8 1 8 1 9 0 7 1 10 UNIVERSAL RG 1000 2 2 1 UNIVERSAL RG 3 3 1 1 1 1 1 1 1 4 4 1 750 650 750...

Страница 35: ...3 4 4 4 5 84 4 6 6000 70 80 1 200 1 10 30 4 7 c 40 8 24 36 5 1 1 12 2 13 3 14 4 15 5 16 6 17 7 18 8 19 9 20 10 21 11 22 23 24 25 900 3 250 400 750 930 900 2040 57 200 40 132 0 01 13 18 19 20 21 22 23...

Страница 36: ...4 1 14 18 21 20 5 4 2 13 9 23 19 24 25 21 20 1 23 2 2 4 5 4 16 20 17 20 3 5 5 9 6 UNIVERSAL RG 10 574 03 18 06 2003 EN 303 5 2012 3 2 85 3 05 05 3 01 01 217 31 01 04 27303 01 6 1 6 1 1 22 6 1 2 22 0...

Страница 37: ...7 17 20 15 6 1 3 6 1 4 6 1 5 6 1 6 6 2 6 2 1 39 Pa 2 6 1 6 2 2 1 2 1 5 6 2 3 45 6 2 4 8 6 3 6 3 1 20 6 3 2 2 2 6 4 6 4 1 6 4 2 0 5 1 1...

Страница 38: ...8 10 6 4 3 6 3 4 6 4 5 6 5 6 5 1 6 5 2 6 5 3 6 5 4 4 5 20 6 5 5 20 2 50 70 6 5 6 6 5 7 6 5 8 6 5 9 15 30 15 5 6 5 10 30 6 5 11 2 6 5 12 600 6 5 13 2 4 75...

Страница 39: ...9 6 6 6 6 1 1 6 6 2 850 6 6 3 2 4 90 6 6 4 6 7 6 7 1 UNIVERSAL RG 6 7 2 2 3 10 15 2 6 7 3 13 9 2 4 40 6 7 4 1 8 6 7 5 1 6 7 6 750 60 6 7 7 100 200 20 6 7 8 6 7 9...

Страница 40: ...10 6 7 10 6 7 11 6 7 12 7 7 1 100 10 2 UNIVERSAL RG 3 2 7 2 7 3 7 4 7 5 3 2 850 7 6 7 7...

Страница 41: ...11 8 8 1 8 2 8 3 8 4 8 5 8 6 8 7 10 10 8 8 8 9 0 1 8 10 8 11 8 12 8 13 8 14 34 03 301 87 139 87 9 95 20...

Страница 42: ...12 10 10 1 10 2 10 1 10 3 11 11 1 11 2 11 3 2 11 4 13 11 5 11 6 11 7...

Страница 43: ...______________________________ _________________132___________________ 2 1 Universal RG ___________ 3 2 750 EN 303 5 2012 20548 4931 007 82749029 2007 30735 2001 4931 008 82749029 2007 ______ ________...

Страница 44: ...14 3 4 3 3 5 4 1 5 1 5 2 6 1 UNIVERSAL RG _____ ____________________201____ ____________ ___________________ __________ _____________ ____________________________________ __________________...

Страница 45: ...15 EN 303 5 2012 20548 4931 007 82749029 2007 24 100 ___________________20___...