8
RITE-HITE VBR-300 DOK-LOK Owner’s Manual
3. Attach base to roller track using (2) 3/4" bolts and nuts
(supplied by others). Use bottom set of holes for a 29"
mounting height and top set of holes for a 27" mounting
height. Verify track is perpendicular to base.
4. Weld plates on base to roller track as shown in
Figure 5
.
5. Remove bolts used in Step 3.
Install
DOK-LOK
vehicle restraint onto dock face at specified
location by welding to an embedded steel plate or by using the
eight (8) concrete anchors provided in conjunction with welding
to pit steel and a leveler frame. Refer to
Figure 6
.
For site specific installation refer to
RITE-HITE
Application
information provided with
DOK-LOK
vehicle restraint. When in
doubt, call
RITE-HITE
Representative or
RITE-HITE
Customer Service at (800) 456-0600.
NOTE
: Some mechanical dock levelers have an adjusting
nut access hole in the leveler front subframe. If the
VBR-300
DOK-LOK
vehicle restraint roller track
interferes with the access hole, the track plate must
be cut to allow access. Refer to
Figure 9, page 9
.
NOTE
: Some levelers may be slightly recessed within pit. A
shim must be inserted between the roller track plate
and the leveler front subframe and then must be
welded in place. Refer to
Figure 10, page 9
for
adding a necessary lip guide.
Anchor Installation Instructions
1. Put
DOK-LOK
vehicle restraint in place.
2. Drill hole of 5/8" diameter and minimum of 4-5/8" deep.
Clean out hole.
3. Insert anchor and drive flush with roller track plate,
making certain that the threaded wedge is put in first. Do
not disassemble anchor prior to installation.
4. Install all anchors and torque to 100 ft-lbs.
Welding Installation Instructions
If the installation being worked on is a “reinstallation” the
following electrical connections must be disconnected prior to
welding. Make sure to LOCKOUT/TAGOUT the power at the
fused disconnect, then remove sensing switch connections
from control box. Once all welding procedures have been
completed, reconnect all wires.
Figure 5
: Weld Plates on Base to Roller Track
• A plumb roller track plate is required. If the dock face
is not plumb/perpendicular, contact your
RITE-HITE
representative or
RITE-HITE
at (800) 456-0600.
• The carriage roller track cannot be bent or deformed.
Straighten or replace as required.
IMPORTANT
Eight (8) concrete anchors are provided with each
VBR-300
DOK-LOK
vehicle restraint. You must install
an anchor in each roller track plate hole except those
plug-welded to embedded steel
Figure 6
: Anchoring Roller Track Plate
Never weld on the VBR-300
DOK-LOK
vehicle
restraint after sensing switches are wired into the
control box and the power to the box is on. Electrical
current from the welder can “feedback” through the
circuit and damage the motor and other components.
IMPORTANT
IMPORTANT
Содержание VBR-300 Dok-Lok
Страница 6: ...6 RITE HITE VBR 300 DOK LOK Owner s Manual Figure 2 VBR 300 DOK LOK Features...
Страница 22: ...22 RITE HITE VBR 300 DOK LOK Owner s Manual Figure 25 LED Status Chart...
Страница 23: ...RITE HITE VBR 300 DOK LOK Owner s Manual 23 Notes...
Страница 26: ...26 RITE HITE VBR 300 DOK LOK Owner s Manual VBR 300 Hydraulic Parts Figure 27 VBR 300 Hydraulic Parts...
Страница 31: ......