background image

Eclipse

®

 Dock Shelter (620G, 620NH)  

Installation/Service/Owner's Manual

 Rite‑Hite

®

6

 Publication:

 AMEN00141 2019-11-22

INSTALLATION

Side Frames

 D

 G

 F

 E

 H

 J

 J

 B

 C

 A

1  Before mounting side frames, install canopy mounting 

brackets (A) to top of side frames (B) 

•  Position bracket so notches at top of bracket are 

flush with the top of the wood, side pad backer (C). 

•  Secure in place with 6 hex head wood screws (J) 

provided

NOTE:

Brackets (A) are not part of the overall unit 

width Unit width when mounting side frames should 
be measured from outside edge of side frames 

Brackets add ≈ 1/4in [6mm] to unit's overall footprint. 

Allowance is accounted for in the header installation

2  Measure and mark:

•  Measure dock door opening width (D) Divide in  

half and mark the centerline of the opening at  
dock level (E)

•  Measure unit width and divide in half Compare to 

PAF (Product Application Form) specs

•  Measure from door centerline (E) to half of the head 

frame dimension (F) and mark the outside wall (at 
the bottom of the door opening or at dock level) 
This mark is for the outside edge of the side frame 

•  Measure (at dock level) from this mark (outside 

edge of the side frame) across the door opening to 
the unit width (G) Mark this measurement for the 
outside edge of the second side frame

•  Consult PAF or sales representative for mounting 

height to the bottom of the side pads (H) Measure 
up from grade on the dock face and mark

NOTE:

Typically, the bottom of the side pad is 

mounted at dock height Some applications may 

require mounting them at a different location.

Example: 

When dock bumpers are mounted 

above dock height or above the pit floor (on vertical 

leveler applications) it may be required to mount 
the bottom of the side pads/side frames at a height 
even with the top of the bumpers

3  Dry fit and shim:

•  Using carpenter’s level, plumb up the wall the height 

of the side frame and mark the outside edges of the 
side frames on the wall at top

•  Measure full width, etc Using a plumb bob or 

carpenter’s level make sure that the outside wall 
is plumb from the highest point on the side frame 
location to dock level

•  Shim side frames as required

Figure 3 

Содержание Eclipse 620G

Страница 1: ...00129 Model 620G 620NH Publication AMEN00141 2019 11 22 NOTICE TO USER 2 SAFETY 3 INSTALLATION Overview 4 Preparation 5 Mounting Methods 5 Side Frames 6 Canopy Header 8 Side Curtains 12 Weighted Seal...

Страница 2: ...by an authorized Rite Hite representative A Planned Maintenance Program P M P customized to your specific operation is available and recommended For a P M P contact your local Rite Hite representative...

Страница 3: ...e environment or cause the equipment to operate improperly NOTE A note is used to inform you of important installation operation or maintenance information Lockout Procedure Barricade work area and po...

Страница 4: ...Overview 1 Unpack and inspect unit 2 Install side frames and bracket anchors 3 Install side arms front bar and canopy top 4 Install side curtains and pocket straps 5 Install gutter roller seal and wea...

Страница 5: ...lag bolt or anchor bolt through bolt method of attachment is required NOTE To determine anchor length use anchor manufacturer s recommendation for minimum anchor embedment Metal Sided Building Throug...

Страница 6: ...wall at the bottom of the door opening or at dock level This mark is for the outside edge of the side frame Measure at dock level from this mark outside edge of the side frame across the door opening...

Страница 7: ...allation 3 on each side of each side pad Figure 5 Example Line up the mounting hole on the bracket with a mortar joint on the wall and attach the mounting bracket to the side frame backer board Attach...

Страница 8: ...bar assembly together and position across the installed side frames and mounting brackets Position it on top so the side arms on the top frame are facing the wall and land between the mounting bracket...

Страница 9: ...corners where the canopy top and end cap meet are laying correctly over the edge of the mounting bracket 6 Drape canopy cover over the front bar the 2 1 2in 65mm square tubing Make sure the canopy cov...

Страница 10: ...late and pipe spacers as needed on the inside of the wall so the mounting bar and the wall will flex together If structure is not aligned with 1 of the pre drilled mounting holes Drill new hole which...

Страница 11: ...pare to value in the PAF If the front bar needs to be raised adjust the pin location I in the pivot arm extension NOTE Typically the bottom of the front bar is at least 12in 305mm higher than the tall...

Страница 12: ...p on the outside of the side curtain completely covers and is properly aligned with the touch and hold fastener on the side frame 3 Continue to align the mounting flap to the outside of the side frame...

Страница 13: ...r Seal_191004 pdf A E Roller Seal Assembly Canopy Top B D C NOTE Canopy removed for clarity 1 Position roller seal assembly so that center tabs A and top edges are aligned the full width B with the ca...

Страница 14: ...1 Insert gutter panels A1 A2 in pocket B located behind 4in 102mm touch and hold fastener on weighted seal Slide 1 HMWPE panel right A1 and 1 HMWPE panel left A2 to fill entire width of pocket 2 Secu...

Страница 15: ...of center foam block A A 4in 100mm overlap Flap Eclipse Manual Wear Panels_191004 pdf 1 2in 13mm MAX Side View Roller Seal Assembly Corner Wear Panel Center Wear Panel Assembly Washer Fastener Gutter...

Страница 16: ...A Secure each front flap 2 1 1 4in self drill tap screws with washers Secure each corner wear panel inside screw goes through center wear panel assembly and corner wear panel 3 2in self drill tap scre...

Страница 17: ...lts with expansion collar or equivalent fastener 4 anchors per bumper required Collapsible Style Draft Pad B D C D A2 A1 1 Open attachment flap s on side member A1 and back of side curtain A2 2 Align...

Страница 18: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 18 Publication AMEN00141 2019 11 22...

Страница 19: ...9 MAINTENANCE Before use inspect all parts for damage Repair and replace as required Clean wash unit with a low pressure hose or damp cloth Keep unit free of snow and ice Metal hoods are recommended t...

Страница 20: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 20 Publication AMEN00141 2019 11 22 PARTS Exploded View 620G Eclipse Manual 620G Exploded Diagram_191004 pdf...

Страница 21: ...Rite Hite Installation Service Owner s Manual Eclipse Dock Shelter 620G 620NH Publication AMEN00141 2019 11 22 21 PARTS Exploded View 620G Continued...

Страница 22: ...Eclipse Dock Shelter 620G 620NH Installation Service Owner s Manual Rite Hite 22 Publication AMEN00141 2019 11 22 PARTS Exploded View 620NH Eclipse Manual 620NH Exploded Diagram_191004 pdf...

Страница 23: ...Rite Hite Installation Service Owner s Manual Eclipse Dock Shelter 620G 620NH Publication AMEN00141 2019 11 22 23 PARTS Exploded View 620NH Continued...

Страница 24: ...ner s premises for the purpose of repairing or replacing the Product or y return of the Product to the Rite Hite F O B Rite Hite s factory NOT WARRANTED Rite Hite does not warrant against and is not r...

Отзывы:

Похожие инструкции для Eclipse 620G