background image

Dok‑Commander

®

 

Installation/Service/Owner's Manual

 Rite‑Hite

®

30 Publication:

 AMEN00070 2020-01-30

PARTS
Dok-Commander

Bottom

Left Side

Right Side

Содержание Dok-Commander

Страница 1: ...atic 13 Wiring Corner Vu Leveler Vu 17 Wiring Pedestrian Vu 18 Wiring Approach Vu 20 Wiring Outside Light Box 21 Wiring Safe T Pit Sensor 22 OPERATION Best Practice Sequence 24 Supply Chain Integrity...

Страница 2: ...8307956 8443474 8464384 8464846 8465245 8497761 8499897 8544130 8547234 8590087 8590673 8616826 8657551 8662535 8678736 8690087 8905198 9010501 9096170 9096397 9126775 9139384 9145273 9150367 9174811...

Страница 3: ...gram P M P As part of this service your local Rite Hite representative will do all routine maintenance lubrication and adjustments 6 Dock equipment that is structurally damaged shall be removed from s...

Страница 4: ...OTE A note is used to inform you of important installation operation or maintenance information Lockout Procedure Barricade work area and post safety warnings Power supply and control must Be disconne...

Страница 5: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 5 FEATURES D C B A A Control Box B Outside Lights C Inside Sign D Outside Sign Figure 1...

Страница 6: ...down when drilling holes Holes on top of control box may allow dust and moisture to enter control box If rigid conduit is installed bonding must be maintained between conduit connections by using grou...

Страница 7: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 7 ELECTRICAL 115V Schematic Dok Comm_115V_Schematic 1 200121 pdf...

Страница 8: ...Dok Commander Installation Service Owner s Manual Rite Hite 8 Publication AMEN00070 2020 01 30 ELECTRICAL 115V Schematic Continued Dok Comm_115V_Schematic 2 200121 pdf...

Страница 9: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 9 ELECTRICAL 115V Schematic Continued Dok Comm_115V_Schematic 3 pdf...

Страница 10: ...Dok Commander Installation Service Owner s Manual Rite Hite 10 Publication AMEN00070 2020 01 30 ELECTRICAL 230V Schematic Dok Comm_230V_Schematic 1 200121 pdf...

Страница 11: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 11 ELECTRICAL 230V Schematic Continued Dok Comm_230V_Schematic 2 200121 pdf...

Страница 12: ...Dok Commander Installation Service Owner s Manual Rite Hite 12 Publication AMEN00070 2020 01 30 ELECTRICAL 230V Schematic Continued Dok Comm_230V_Schematic 3 pdf...

Страница 13: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 13 ELECTRICAL 3 Phase Schematic Dok Comm_3PH_Schematic 1 200121 pdf...

Страница 14: ...Dok Commander Installation Service Owner s Manual Rite Hite 14 Publication AMEN00070 2020 01 30 ELECTRICAL 3 Phase Schematic Continued Dok Comm_3PH_Schematic 2 200121 pdf...

Страница 15: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 15 ELECTRICAL 3 Phase Schematic Continued Dok Comm_3PH_Schematic 3 pdf...

Страница 16: ...Dok Commander Installation Service Owner s Manual Rite Hite 16 Publication AMEN00070 2020 01 30 ELECTRICAL 3 Phase Schematic Continued Dok Comm_3PH_Schematic 4 pdf...

Страница 17: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 17 ELECTRICAL Wiring Corner Vu Leveler Vu RIte Vu Schematic 200121 pdf Figure 2...

Страница 18: ...Dok Commander Installation Service Owner s Manual Rite Hite 18 Publication AMEN00070 2020 01 30 ELECTRICAL Wiring Pedestrian Vu Leveler Stored to Unlock Restraint RIte Vu Schematic 200121 pdf Figure 3...

Страница 19: ...te Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 19 ELECTRICAL Wiring Pedestrian Vu Continued Leveler Stored to Close Overhead Door RIte Vu Schematic 200121 pdf Fi...

Страница 20: ...Dok Commander Installation Service Owner s Manual Rite Hite 20 Publication AMEN00070 2020 01 30 ELECTRICAL Wiring Approach Vu Appr Vu_Approach Vu for Manuals 170520 pdf Figure 5...

Страница 21: ...side Light Box To Controls Red Lamp Green Lamp Light Box Cover 40 Wire 12 VDC Red Light OSR Term for Gen2 OSR Term for URC 40 Term for SDL Green Light 41 Wire 12 VDC Green Light OSG Term for Gen2 OSG...

Страница 22: ...D13 LD11 LD39 LD20 LD40 LD37 LD42 LD48 LD10 LD49 LD46 LD44 LD43 LD41 LD38 OSG OSR LVLRCNTR MWLACTR MWLALM UDITCOUT GLTITL CVURD CVUGN LVURD LVUGN PVUALM PVULT AUTOITC UDITCIN KYDHORNOVRD CTRLPWR OSLTI...

Страница 23: ...M COM COM PVUDET PVUEN SW2 SW1 LD35 SD K1 K2 DIAG SW2 SW6 RES O L FACTORY JUMPERS 18GA WH BL J14 1 J14 2 J14 3 J14 5 RESET LD51 PROG LD7 J2 12VDC DETAIL A RESTRAINT POWER CKT BD LOWER RIGHT CORNER 12V...

Страница 24: ...o green 3 Dock operator opens the overhead door Leveler controls are now active 4 Dock operator lowers leveler into trailer 5 Truck is ready to be loaded 6 When loading operation is complete operator...

Страница 25: ...backed into loading dock and is parked firmly against dock bumpers Hook rotates from STORED position to entrap R I G If horn sounds go to FAULT State from LOCKING State if not go to Restraint LOCKED...

Страница 26: ...nside light turns red and horn sounds press LOCK button to secure R I G WARNING Visually confirm Dok Lok barrier obstructs R I G of trailer being serviced before operating dock leveler Green Alerts op...

Страница 27: ...NLOCKING State Hook cannot rotate to STORED position Hook could be caught on R I G or another part of trailer Verify trailer is parked firmly against dock bumpers If not press LOCK to entrap R I G hav...

Страница 28: ...ange Procedure Reasons for program change Restraint change Adding or removing green light interlock with either the leveler or overhead door Adding or removing Control Power Keyed Horn Override Coded...

Страница 29: ...uid Stop cycling once Dok Lok barrier travels up and down without hesitation 5 To exit FILL MODE Press DIAGNOSTIC button or Press no buttons for 5 minutes or Cycle power Fill Mode Input Outputs Chart...

Страница 30: ...Dok Commander Installation Service Owner s Manual Rite Hite 30 Publication AMEN00070 2020 01 30 PARTS Dok Commander Bottom Left Side Right Side...

Страница 31: ...Rite Hite Installation Service Owner s Manual Dok Commander Publication AMEN00070 2020 01 30 31 PARTS Dok Commander Continued Dok Comm_Enclosure_Assembly 2020 01 21 pdf...

Страница 32: ...ap 145118 Motor Overload Relay 127199 QTY DESCRIPTION PART 217 1 Transformer 500VA 230 460V 146025 Transformer 500VA 575V 146026 Transformer 1000VA 230 460V 146027 Transformer 1000VA 575V 146028 Trans...

Страница 33: ...0V 3PH incoming power 103229 QTY DESCRIPTION PART 507 2 2A fuse CC Dual element time delay 500VA transformer and 575V incoming power 66019 2 5A fuse CC Dual element time delay 500VA transformer and 46...

Страница 34: ...142101 703 6 Screw round head 6 32 0 25 length 133366 704 6 Lock washer 6 51826 705 7 Standoff Male Female 6 32 0 75 length 142100 706 4 Standoff Male Female 6 32 1 625 length 142101 707 7 Screw round...

Страница 35: ...62THK Rubber 145920 7 4 Nut 1 14UNS Plastic 145776 8 1 Ped VU Enclosure Sensor Light BLUE Left 150027 9 1 Ped VU Enclosure Sensor Light BLUE Right 150028 10 2 Ped VU LED Light Assembly 150026 11 1 Ped...

Страница 36: ...2 5 4 5 5 3 3 3 4 5 4 2 3 5 6 9 2 4 4 6 3 6 5 6 2 15 1 1 2 5 4 5 5 3 3 3 4 5 1 Pedestrian Vu 2 15 1 5 4 5 4 7 8 2 15 1 1 2 5 4 5 5 3 3 3 4 5 7 8 8 7 QTY DESCRIPTION PART 1 2 Mounting Bracket Assembly...

Страница 37: ...2 SCR 250 20X 625 CAP FLAT SST 150717 5 1 APPROACH VU CABLE ASSY 18 2 PVC RCPT 92L 150795 6 1 APPROACH VU WARNING SIGN 150669 7 1 TRUCK SENSOR RAVE CBL 26FT 150688 8 1 TRUCK SENSOR BRACKET 6 188L 1506...

Страница 38: ...9623 2 2 CAMERA WEATHERPROOF INP 12VDC LENS 120DEG WH IP68 149622 3 1 JUNCTION BOX 4X4X2 N4 2HOLE 540DIA 156252 4 2 CORD GRIP 11 25 CORD DOME BK 25NPT 156649 5 1 BRACKET EXTENDED Lok Vu 156240 6 12 SC...

Страница 39: ...TAINER 66067 11 1 TERMINAL END BARRIER 65599 12 4 TERMINAL MARKER 65601 13 2 TERMINAL BLOCK CENTER JUMPER 2P W4 113590 14 4 TERMINAL BLOSK 600V 30A 22 10AWG IEC 65476 15 1 TIMER RELAY 05S 60HR INPUT 1...

Страница 40: ...e or normal wear and tear of the Product iii failure to follow Rite Hite s instructions for installation failure to operate the Product within the Product s rated capacities and or specified design pa...

Отзывы: