background image

1 | 

P a g e

 

 

 

Installation Instructions 

6S-WDC 

6x6 Surface Mount Wall Mount Double Cubic Pergola Kit 

Pergola Kits 

 
 
 

 

 
 
 

 

Figure 1: Items included in the kit, ( 

𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷

𝑄𝑄𝑄𝑄𝑄𝑄𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝐷𝑄𝑄

)

Items not included in this kit: wood, tools, some hardware. 

WARNING:

 If the information in these instructions is not followed exactly, weakening or failure of the erected 

structure may result causing property damage, personal injury, or loss of life. 

All brackets designed and sold by RioOutdoors.com are to be used for building pergolas only and are not to be used for 

other structure construction purposes. 

 

Thoughtfully engineered 

Brackets eliminate all wood-

joinery skills requirements.

 

 

Skills required: drill holes 

in concrete and hammer 

in anchors, drilling pilot 

holes and driving lag 

screws into lumber.

 

 

Easy lift and place U-

channels eliminate need 

for lifting equipment. 

Super-easy assembly 

work.

 

 

Self-aligning design 

squares up structure 

automatically.

 

 

Estimated Assembly 

Time is less than 1-hour. 

 

Содержание 6S-WDC

Страница 1: ...y damage personal injury or loss of life All brackets designed and sold by RioOutdoors com are to be used for building pergolas only and are not to be used for other structure construction purposes Thoughtfully engineered Brackets eliminate all wood joinery skills requirements Skills required drill holes in concrete and hammer in anchors drilling pilot holes and driving lag screws into lumber Easy...

Страница 2: ...d hole depth for various lag screws and wood types Lag Screw Type Wood Type Pilot hole drill diameter and hole depth X 1 1 4 Lag Screw McMasterCarr com SKU 92351A546 Soft Wood 3 32 drill bit diam 1 1 4 depth Hard Wood 3 16 drill bit diam 1 1 4 depth 3 8 X 3 Lag Screw McMasterCarr com SKU 92351A636 Soft Wood 11 64 drill bit diam 3 depth Hard Wood drill bit diam 3 depth A properly sized pilot hole m...

Страница 3: ...s from the local building inspection department or the local jurisdiction having authority over building codes 1 1 2 Other Cautions CAUTION Adhere to all safety requirements Wear safety glasses goggles when working Wear safety gloves when handling brackets hardware and lumber Wear hearing protection when using a circular saw miter saw table saw or hammer drill INSTALLER Leave this manual with the ...

Страница 4: ...es 7 16 Hex Socket Drive X 1 1 4 Hex Hd lag screws All pergola types 9 16 Hex Socket Drive 3 8 X 3 Hex Hd lag screws Raftered pergola single dual quad headers 3 32 Drill Bit Drill pilot holes for lag screws in soft wood All pergola types 11 64 Drill Bit Drill pilot holes for 3 8 lag screws in soft wood Raftered pergola single dual quad headers X 4 Masonry Drill Bit Drill X 2 deep holes in concrete...

Страница 5: ...ectly via email at info RioOutdoors com Include your name and shipping address and your order number if available We will respond within 24 hours with a resolution to your problem Item SKU Description Item Qty Item Image 6x6 Post Top Floor 2 way Elbow Bracket SKU 6C2L 2 6x6 Post Top Floor 2 Way Straight Extension SKU 6SE 1 6x6 Wall Mount Bracket SKU 6WM 2 6x6 Fixed Floor Anchor Bracket SKU 6FA 3 x...

Страница 6: ...Description Item Qty Item Cost Total Item Cost Item Image 6x6 Post Lumber You determine length 2 NA 6x6 Header Lumber You determine length 3 NA 1 2 X 2 3 4 1 2 13 threads Vibration Resistant Hammer On Stud Anchor for Concrete McMasterCarr com SKU 92188A305 16 3 8 x 3 SS Lag Screws for deck mounting McMasterCarr com SKU 92351A636 16 Suitable Anchors to secure Wall Mount Bracket to wall 8 NA Tape fo...

Страница 7: ...port the weight of the pergola For concrete footings the required depth is determined by the maximum depth of the frost line for a particular area The diameter of the footing is determined by the weight that each footing is subjected to by the pergola structure If you choose to use concrete footings or to add this pergola on top of an existing wooden deck consult your local building permit office ...

Страница 8: ...header members Plan accordingly to minimize your work requirements The length of the headers you select will determine the final size and location of the post centers Mark each post location using chalk Trace the outer profile of the Floor Anchor Bracket s floor plate Remeasure and verify the proper location for each post Header 1 Length in Dim A in 96 99 108 111 120 123 132 135 144 147 Header 2 L...

Страница 9: ... 102 5 120 120 114 5 132 132 126 5 144 144 138 5 1 5 4 Call 811 811 is the national call before you dig phone number Anyone who plans to dig should call 811 or go to their state 811 center s website before digging to request that the approximate location of buried utilities be marked with paint or flags so that you don t unintentionally dig into an underground utility line Consult with your local ...

Страница 10: ...e ground level 4 Along the outer 2 3 inches create a downward tapered profile moving away from the footing center in all directions on the concrete top surface This taper will help water flow away from the post bracket 5 Wait 7 days for the concrete footing to cure before proceeding with the remaining construction work If quick setting concrete is used cure times may be shorter read the informatio...

Страница 11: ...chor you will be using to anchor the bracket to the concrete footing or pad 3 Drill into the concrete through the four holes in the bracket bottom plate and into the concrete using a hammer drill and masonry drill bit Drill minimum 2 1 4 deep and maximum 2 3 8 depth Do not drill less than 2 1 4 depth as the anchor will not pinch the bracket down fully if the hole is less than 2 deep 4 Using compre...

Страница 12: ...permit office It is important to be cautious when installing a pergola on top an existing wooden deck You must plan to add extra cross support beams for low weight pergolas like cubic shaped pergolas For heavier pergolas like raftered pergolas you must plan and add new support posts directly under the pergola posts which will transfer the pergola load to the ground At the ground level a concrete f...

Страница 13: ...7 INSTALLING PERGOLA POSTS 1 Slide one 4x4 post inside a Floor Anchor Let gravity pull the post all the way down 2 Identify the 5 16 holes in two opposite faces in the floor anchor square tube two holes in each face ...

Страница 14: ...1 1 4 holes at the center of each 5 16 hole four holes total see step 2 4 Drive a X 1 1 4 lag screw through each pilot hole using a rachet and 7 16 socket Tighten down all lag screws 5 Repeat steps 1 to 3 for all vertical posts ...

Страница 15: ...s 1 Slide the 2 way elbow bracket s tube over the 6x6 post top after aligning the header receiver u channels in the proper direction Let gravity work and pull the bracket all the way down on top of the post 2 Identify the four 5 16 holes which are on the sides of the gussets in the bracket ...

Страница 16: ...t as a hole depth indicator when you drill each pilot hole Pilot holes should be drilled at least 1 1 4 deep A little bit deeper is acceptable but do not drill less than the required 1 1 4 depth 4 Drill 3 32 X 1 1 4 deep pilot holes at the center of four 5 16 Holes Locate pilot holes at the center of each 5 16 hole ...

Страница 17: ... Drive one x 1 1 4 Hex Lag Screw through each 5 16 hole into the pilot holes you drilled in step 4 using a 7 16 Socket and Rachet driver Tighten down each screw 6 Repeat steps 1 through 5 for each post top bracket ...

Страница 18: ...ing directions 1 Orient the post top 2 way extension bracket s U channels in the desired direction and slide the square tube over the top of the center post Let gravity pull it down If it resists tap the top lightly with a mallet 2 Locate two 5 16 holes on two opposing sides of the tube adjacent to the gussets 4 holes total Drill 3 32 x 1 1 4 deep pilot holes in the center of the 5 16 holes ...

Страница 19: ...19 P a g e 3 Using a 7 16 socket and ratchet driver drive a X 1 1 4 Lag Screw through each pilot hole you drilled ...

Страница 20: ...2 way extension bracket 1 Lift and place one 6x6 header into the U channels of adjacent post top bracket 2 Locate the two 5 16 holes on each vertical face of the U channels holding the 6x6 header Drill 3 32 X 1 1 4 deep pilot holes at the center of four 5 16 Holes Locate pilot holes at the center of each 5 16 hole ...

Страница 21: ...e 3 Drive one x 1 1 4 Hex Lag Screw through each 5 16 hole into the pilot holes you drilled in step 8 using a 7 16 Socket and Rachet driver Tighten down each screw 4 Repeat steps 1 3 for the remaining 3 headers ...

Страница 22: ...Mark a horizontal line which will align with the wall mount bracket s U channel bottom surface and mark a vertical line which will align with one vertical face of the wall mount bracket s U channel 2 The type of wall material will determine the type of fastener you must use to attach the wall mount bracket to the wall For walls with siding on top of plywood sheathing consider an expandable toggle ...

Страница 23: ...a g e 3 Mount the wall mount brackets to the wall using appropriate fasteners 4 Lift and place a proper length header in the U channels in the post top 2 way elbow bracket and the adjacent wall mount bracket ...

Страница 24: ...enter of all 5 16 diameter holes which are predrilled in the side faces of the U channels in the post top 2 way elbow bracket and the wall mount bracket 6 Drive x 1 1 4 Lag Screw through all pilot holes you drilled using a 7 16 Socket and Ratchet Driver ...

Страница 25: ...e construction project went for you Was it easy to do Did parts fit easily and properly Do you like the quality of our products and design styles Is your pergola structure sturdy and strong Please go to RioOutdoors com and provide us with your review Thank you for being a RioOutdoors com customer ...

Страница 26: ...n for evaluation Incomplete claims may be rejected All pergola brackets must be installed according to all manufacturers instructions as per the installation instruction manual by a RioOutdoors com All Local and National required codes must be met Repair replacement parts purchased by the consumer from RioOutdoors com after the original coverage has expired will carry a 90 day warranty valid with ...

Страница 27: ...R ANY INCIDENTAL OR CONSEQUENTIAL COMMERCIAL DAMAGES OR DAMAGES TO PROPERTY TO THE EXTENT PERMITTED BY APPLICABLE LAW RioOutdoors com MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY SPECIFIED HEREIN THE DURATION OF ANY IMPLIED WARRANTY IS LIMITED TO DURATION OF THE EXPRESSED WARRANTY SPECIFIED ABOVE IF IMPLIED WARRANTIES CANNOT BE DISCLAIMED THEN SUCH WARRANTIES ARE LIMITED IN DURATION TO THE ...

Отзывы: