background image

15 | 

P a g e

 

 

1.9

 

POST-TOP DUAL HEADER BRACKET INSTALLATION 

1.

 

Slide one Post-Top Dual Header Bracket over the 4x4 post top after aligning the headers receiver u-channels in the 

proper direction. Let gravity work and pull the bracket all the way down on top of the post.  

 

2.

 

Identify one 5/16” hole which is located at the center of the top surf ace of the dual header bracket.  

 

Содержание 6S-DH

Страница 1: ... are not to be used for other structure construction purposes Thoughtfully engineered Brackets eliminate all wood joinery skills requirements Skills required drill holes in concrete and hammer in anchors drilling pilot holes and driving lag screws into lumber Easy lift and place U channels eliminate need for lifting equipment Super easy assembly work Self aligning design squares up structure autom...

Страница 2: ...er and hole depth for various lag screws and wood types Lag Screw Type Wood Type Pilot hole drill diameter and hole depth X 1 1 4 Lag Screw McMasterCarr com SKU 92351A546 Soft Wood 3 32 drill bit diam 1 1 4 depth Hard Wood 3 16 drill bit diam 1 1 4 depth 3 8 X 3 Lag Screw McMasterCarr com SKU 92351A636 Soft Wood 11 64 drill bit diam 3 depth Hard Wood drill bit diam 3 depth A properly sized pilot h...

Страница 3: ...n approvals from the local building inspection department or the local authority over building codes 1 1 2 Other Cautions CAUTION Adhere to all safety requirements Wear safety glasses goggles when working Wear safety gloves when handling brackets hardware and lumber Wear hearing protection when using a circular saw miter saw table saw or hammer drill INSTALLER Leave this manual with the consumer C...

Страница 4: ...ypes 7 16 Hex Socket Drive X 1 1 4 Hex Hd lag screws All pergola types 9 16 Hex Socket Drive 3 8 X 3 Hex Hd lag screws Raftered pergola single dual quad headers 3 32 Drill Bit Drill pilot holes for lag screws in soft wood All pergola types 11 64 Drill Bit Drill pilot holes for 3 8 lag screws in soft wood Raftered pergola single dual quad headers X 4 Masonry Drill Bit Drill X 2 deep holes in concre...

Страница 5: ...ail at info RioOutdoors com Include your name and shipping address and your order number if available We will respond within 24 hours with a resolution to your problem Item SKU Description Item Qty Item Image Post Top Dual Header Bracket SKU 6DH 4 6x6 Fixed Floor Anchor Bracket SKU 6FA 4 Rafter Tie Bracket SKU 68RT 18 x 1 1 4 SS Lag Screw McMasterCarr com SKU 92351A546 144 3 8 x 3 SS Lag Screw McM...

Страница 6: ...tem Qty Item Cost Total Item Cost Item Image 6x6 Post Lumber You determine length 4 2x6 or 2x8 Header Lumber 12 ft max 2x6 16 ft max 2x8 4 2x6 or 2x8 Rafter Lumber You determine length 16 centers 9 for 12 ft header 11 for 16 ft headers 1 2 X 2 3 4 1 2 13 threads Vibration Resistant Hammer On Stud Anchor for Concrete McMasterCarr com SKU 92188A305 16 3 8 x 3 SS Lag Screws for deck mounting McMaster...

Страница 7: ...port the weight of the pergola For concrete footings the required depth is determined by the maximum depth of the frost line for a particular area The diameter of the footing is determined by the weight that each footing is subjected to by the pergola structure If you choose to use concrete footings or to add this pergola on top of an existing wooden deck consult your local building permit office ...

Страница 8: ... desire for your poergola Determine the exact location for each pergola post based on your pergola size We have designed our pergola systems to eliminate the need to cut any 6x6 post or header members Plan accordingly to minimize your work requiremens Mark each post location using wood stakes or bright colored spray paint Remeasure and verify the proper location for each post ...

Страница 9: ...e Mount footing system 1 Excavate the required hole diameter and depth 2 Pour concrete into the footing holes 3 Work in 6 incremental depths Tap concrete with the tip of a trowel to remove air bubbles Work upward until you reach ground level or 1 above ground level 4 Along the outer 2 3 inches create a downward tapered profile moving away from the footing center in all directions on the concrete t...

Страница 10: ...the side elevation profile for this pergola system Dim A above is the height of the post used Dim B is the inner ceiling height of the pergola Dim B is measured to the bottom surface of the header member Post Height Dim A Dim B 96 96 92 3 4 108 108 104 3 4 120 120 116 3 4 132 132 128 3 4 144 144 140 3 4 ...

Страница 11: ...chor you will be using to anchor the bracket to the concrete footing or pad 3 Drill into the concrete through the four holes in the bracket bottom plate and into the concrete using a hammer drill and masonry drill bit Drill minimum 2 1 4 deep and maximum 2 3 8 depth Do not drill less than 2 1 4 depth as the anchor will not pinch the bracket down fully if the hole is less than 2 deep 4 Using compre...

Страница 12: ...mit office It is important to be cautious when installing a pergola on top an existing wooden deck You must plan to add extra cross support beams for low weight pergolas like cubic shaped pergolas For heavier pergolas like raftered pergolas you must plan and add additional support posts directly under the pergola posts which will transfer the pergola load to the ground At the ground level a concre...

Страница 13: ...8 INSTALLING PERGOLA POSTS 1 Slide one 4x4 post inside a Floor Anchor Let gravity pull the post all the way down 2 Identify the 5 16 holes in two opposite faces in the floor anchor square tube two holes in each face ...

Страница 14: ...1 1 4 holes at the center of each 5 16 hole four holes total see step 2 4 Drive a X 1 1 4 lag screw through each pilot hole using a rachet and 7 16 socket Tighten down all lag screws 5 Repeat steps 1 to 4 for all vertical posts ...

Страница 15: ...Header Bracket over the 4x4 post top after aligning the headers receiver u channels in the proper direction Let gravity work and pull the bracket all the way down on top of the post 2 Identify one 5 16 hole which is located at the center of the top surf ace of the dual header bracket ...

Страница 16: ...drill bit tip This will act as a hole depth indicator when you drill each pilot hole Pilot holes should be drilled at least 1 1 4 deep A little bit deeper is acceptable but do not drill less than the required 1 1 4 depth 4 Drill a 3 32 X 1 1 4 deep pilot hole at the center of the 5 16 Hole ...

Страница 17: ... one x 1 1 4 SS Hex Lag Screw through the 5 16 hole into the pilot hole you drilled in step 4 using a 7 16 Socket and Rachet driver Tighten down the screw 6 Repeat steps 1 through 5 for each post top dual header bracket ...

Страница 18: ... tail design shape that you plan to cut yourself or you plan to outsource the design cutting You may have your own design that you wish to apply to the rafter tails The possibilities for rafter tail designs are endless and a minor change in detail can add a dramatic flair to your pergola design Be creative 1 10 2 Rafter Tie Brackets Installation For a dual header pergola system rafter ties are req...

Страница 19: ... morning as the sun rises in the sky and earlier in the afternoon as the sun starts to sink in the sky as compared to using 16 spacings Here we assume that you selected 16 spacings for the rafters Adjust the mark location if you choose 12 rafter spacings 4 Measure outward 16 inches incrementally and mark a line at each 16 point out from center until you reach the end of the header on each side 5 S...

Страница 20: ...il mark points 8 On the inner header place a rafter tie at the first pencil mark on each side of the center most pencil mark Then skip every other pencil mark and place rafter ties on alternating pencil mark as shown in the image below SKIP EVERY OTHER PENCIL LINE MARK PLACE RAFTER TIES ON THE INNER HEADER PLACE RAFTER TIES SKIP EVERY OTHER PENCIL LINE MARK ON THE OUTER HEADER ...

Страница 21: ...he 5 16 holes in the Rafter Tie brackets Two 5 16 holes exist on each side of the Rafter Tie Bracket 10 Using a 7 16 Socket and Ratchet Driver drive a x 1 1 4 Lag Screw through the two holes on each side of the Rafter to secure the rafter tie to the header ...

Страница 22: ...22 P a g e 11 Repeat steps 9 and 10 for all rafter ties on both headers Also assemble two headers for the other side of the pergola using the same instructions OUTER HEADER INNER HEADER ...

Страница 23: ... 2 Center the header between the two posts by measuring the overhangs and moving the header until the overhang lengths on both sides are equal 3 Lift and place the inner header into the inner U channel Align end of inner header with end of outer header 4 Repeat steps 1 to 3 for the opposite side of the pergola OUTER HEADER INNER HEADER ...

Страница 24: ...er headers for all four post top dual header brackets Locate pilot holes at the center of each 5 16 holes 6 Drive one x 1 1 4 Hex Lag Screw through each 5 16 hole into the pilot holes you drilled using a 7 16 Socket and Rachet driver Drive screws into both inner and outer headers Tighten down each screw 7 Repeat steps 5 and 6 for all four post top dual header brackets WING EXTENSIONS TWOSCREWTHIS ...

Страница 25: ...ot hole the tape edge will indicate when you have reached the required depth 9 Locate two 7 16 holes on the decorated face of the post top dual header bracket Drill an 11 64th X 3 deep pilot hole in the center of each 7 16 hole The pilot hole will go through the header and into the 4x4 post Drill at least 3 deep or a little bit deeper not shallower TWO HOLES ON THIS SIDE ALSO ...

Страница 26: ...socket and ratchet through the header and into the post through the pilot holes you drilled Tighten all screws 1 Repeat steps 9 10 for all 7 16 holes in all decorated faces in the four dual header brackets at all four post tops TWO SCREWS ON THIS SIDE ALSO ...

Страница 27: ...ne rafter on a matching pair of rafter tie brackets Measure the rafter overhang on each side of the outer headers and center the rafter 2 Drill 3 32 x 1 1 4 deep pilot holes in center of two holes in the Rafter Tie bracket faces on both sides of the rafter TWO HOLES ON THIS SIDE ALSO CENTER RAFTER TIE ...

Страница 28: ... socket and ratchet driver drive x 1 1 4 Lag Screws through the pilot holes you drilled in the header Two x 1 1 4 Lag Screws are required on both sides of the header 4 Repeat steps 1 to 3 and install all rafters and lag screws ...

Страница 29: ...te Let us know how the construction project went for you Was it easy to do Did parts fit easily and properly Do you like the quality of our products and design styles Is your pergola structure sturdy and strong Please go to RioOutdoors com and provide us with your review Thank you for being a RioOutdoors com customer ...

Страница 30: ...n for evaluation Incomplete claims may be rejected All pergola brackets must be installed according to all manufacturers instructions as per the installation instruction manual by a RioOutdoors com All Local and National required codes must be met Repair replacement parts purchased by the consumer from RioOutdoors com after the original coverage has expired will carry a 90 day warranty valid with ...

Страница 31: ...R ANY INCIDENTAL OR CONSEQUENTIAL COMMERCIAL DAMAGES OR DAMAGES TO PROPERTY TO THE EXTENT PERMITTED BY APPLICABLE LAW RioOutdoors com MAKES NO EXPRESS WARRANTIES OTHER THAN THE WARRANTY SPECIFIED HEREIN THE DURATION OF ANY IMPLIED WARRANTY IS LIMITED TO DURATION OF THE EXPRESSED WARRANTY SPECIFIED ABOVE IF IMPLIED WARRANTIES CANNOT BE DISCLAIMED THEN SUCH WARRANTIES ARE LIMITED IN DURATION TO THE ...

Отзывы: