23 |
P a g e
1.13
4X4 HEADERS INSTALLATION
1.
Lift and place one 4x4 header into the U-channels of adjacent post-top bracket.
2.
Locate the two 5/16” holes on each vertical face of the U-channels holding the 4x4 header. Drill 3/32” X 1-1/4”
deep pilot holes at the center of four 5/16” Holes. Locate pilot holes at the center of each 5/16” hole.