background image

RIB2310/RIB2311 Sapphire/Neo Zero Clearance Box Assembly 

 11955-F  06-14

1

Rinnai New Zealand Ltd. 

0800 746 624

Rinnai Australia Pty. Ltd. 

1300 555 545 

 

 

Before installation:

•  Unpack the assembly and check for damage—DO NOT install any damaged items

•  Check all components have been supplied 

•  Read these instructions to get an overview of the steps required before starting the installation 

Failure to follow these instructions could cause a malfunction of the appliance. This could result in 
serious injury and property damage.

3

5

4

2

10

1

10

9

12

8

5

6

2

7

R2340
Item Qty. Description

1

1

ZC box base

2

2

ZC box side

3

1

ZC box top

4

1

ZC box rear

5

1

ZC spigot guide

6

2

Panel burn box guide side

7

1

Air duct outlet gasket

8

1

Spigot top assembly

9

1

Spigot rear

10

2

Edge protector white

11

31

Screw 8x10 AB zinc

12

2

Rivet pop plain73 AS 4.2

Important

To ensure the spigot assembly lines up correctly inside the enclosure and that the appliance is 

installed flush, the front edge of the zero clearance box should sit flush with the front edge of the 

cladding surface.

The drywall drops down to the level indicated by the two arrows either side of the box.

To put together the full assembly you also need to have the flue spigot (ordered separately).

RIB2310/RIB2311 Sapphire/Neo 

Zero Clearance Box assembly

Содержание ZERO CLEARANCE

Страница 1: ... R2340 Item Qty Description 1 1 ZC box base 2 2 ZC box side 3 1 ZC box top 4 1 ZC box rear 5 1 ZC spigot guide 6 2 Panel burn box guide side 7 1 Air duct outlet gasket 8 1 Spigot top assembly 9 1 Spigot rear 10 2 Edge protector white 11 31 Screw 8x10 AB zinc 12 2 Rivet pop plain73 AS 4 2 Important To ensure the spigot assembly lines up correctly inside the enclosure and that the appliance is insta...

Страница 2: ...5 545 General information Ø 146 81 790 361 Ø 53 86 45 650 Assembly 1 Rivet the spigot guide to the spigot assembly Assemble flue spigot and rivet from the underside the spigot guide handle provided in the zero clearance box kit to the spigot assembly When this spigot is used with the zero clearance box these dimples are to be drilled at Ø3 2 ...

Страница 3: ...earance box Lie the base panel on the floor and using the screws provided in the assembly pack screw the side panels to the base and then attach the rear panel 3 Attach full spigot assembly and top panel Drill out the two 3 3 mm holes in the spigot where the two dimples are located Screw the full spigot assembly to the back panel of the zero clearance box though the back of box and attach the top ...

Страница 4: ...w holes the set you use will be dependent on the cladding thickness The zero clearance box MUST BE installed flush with the cladding surface to ensure alignment of the flue Cladding surface Zero clearance box front cutout Top of Neo engine Top of zero clearance box 5 Apply edge protector Apply white edge protectors provided in the assembly pack to the gas and electrical access holes 6 Side rails S...

Отзывы: