Rinnai Australia
1
Sapphire Operation & Installation Manual
BEFORE YOU START
INSTALLATION REQUIREMENTS
This heater must be installed by an authorised person. The installation must conform to local regulations.
The installation must also comply with the instructions supplied by Rinnai.
Service and removal must be carried out by an authorised person.
CERTIFICATION
The Rinnai Sapphire
®
has been certified by the Australian Gas Association.
The AGA Certification Number is shown on the appliance dataplate.
No parts or functions should be modified or permanently removed from the heater.
Please keep these instructions in a safe place for future reference.
CARTON CONTENTS / ITEM CHECKLIST
The components for Sapphire heater are supplied in separate cartons, the following tables list which components
are in each carton. Ensure that the components listed for the installation method being installed are present before
proceeding with the installation.
The Engine and Fascia are packed into two separate cartons and are required for all installation
types. Masonry installations may require a flexiliner flue to be installed, refer to “MASONRY FLUE
INSTALLATION” on page 30 for details.
Component Descriptions
Carton Contents
Engine
Fascia
Engine and Fascia - Masonry Installations (x2 Cartons)
Rinnai Sapphire Engine.
Fascia.
Glass dress guard.
Inner metal surround.
Artificial log set / burn media, Satchel burner granules (shipped inside engine).
Semi rigid stainless steel gas pipe with 5/8” connections (x1).
½” BSP - 5/8” UNF flared brass adaptors (x1).
½” BSP Flared nut (x1).
5/8” UNF Plug (x1).
Fascia attachment screws (2 x 8g black, pre-fitted in tabs of heater engine).
Adhesive backed foam sealing strip.
Operation and Installation manual.
IMPORTANT
12
6
11
7
8
9
1
4
5
2
3
5
5
A
10
10
4
A
1
2
3
4
5
6
7
8
9
10
11
12