Rinnai Australia
32
Sapphire Operation & Installation Manual
HEATER ENGINE INSTALLATION - MASONRY
Step 4.
Positioning the Heater Engine
Place the heater engine in front of the fireplace enclosure.
Step 5.
Connect Electrical Supply
Plug in the 3 pin connector if electrical connections inside
the fireplace.
Step 6.
Prepare Gas Supply
Remove the threaded brass plug from the S/S flexi pipe
consumer gas supply pipe.
Step 7.
Insert Heater Engine Into Fireplace
Carefully move the heater engine into the fireplace ensuring
the gas supply pipe and fittings
feed into the rear access
hole.
Step 8.
Securing The Heater Engine
Fasten the heater to the masonry work using appropriate
fasteners (not supplied) using the three holes across the top
of the fascia assembly mounting panel and in at least 2 of
the holes on each side of the side panels as shown
.
Step 9.
Connecting Gas
Firmly grasp the S/S flexi pipe
and bend at 90°
approximately mid way to line up with the gas control valve
inlet
then attach pipe to gas control valve and tighten.
Step 10. Leak Testing
Turn gas back ON and leak test appliance connection.
Step 11. Completing Heater Installation
Go to “COMPLETING HEATER INSTALLATION” on
page 42.
A panel from the cardboard packing carton
placed on the floor underneath the heater will
help prevent possible damage to flooring.
Take care that the electrical cord does not
bunch up or get pinched behind the heater
engine.
Use a soapy solution to test all gas
connections. If a leak is present bubbles will
form at the leak point. When finished remove
any residue with a rag. Prevent any soapy
solution from coming in contact with electrical
components.
D
E
D
D
F
F
HINT
D
CAUTION
E
D
F
CAUTION