Rinnai Australia
31
Sapphire Operation & Installation Manual
HEATER ENGINE INSTALLATION - MASONRY
MASONRY INSTALLATION OVERVIEW
MASONRY INSTALLATION - DETAIL
Step 1.
Prepare Site
Step 2.
Unpack The Heater Engine
The heater engine is supplied in one carton, check to ensure you have all contents as listed on “BEFORE YOU
START” on page 1 at the start of this manual before proceeding.
Carefully remove carton by removing the straps and lifting the carton off the appliance. Remove all packaging
materials and check all components for damage. If
ANY
damage is evident
DO NOT
install or operate this
appliance. Contact your supplier for advice.
Before installing the heater, check it is labelled for the correct gas type, (refer to the gas type label on the top body
panel of the heater). Refer to the local gas authority for confirmation of gas type if you are in doubt.
Step 3.
Preparing Heater Engine
Attach the adhesive backed foam sealing strip
supplied to rear face of the fascia assembly mounting panel
.
Ensure the seal is stuck to the Fascia Assembly mounting panel at approximately 30mm from the top edge
.
The foam strip is intended to form a seal between the heater and the fireplace brickwork. If an adequate seal cannot
be formed then another means of sealing must then be used. (e.g. non combustible insulation or heat resistant
silicon).
Read this manual thoroughly and gain a full understanding of the requirements before
undertaking installation.
Ensure gas supply to heater is turned off for the first stages of this instruction.
Step 1.
Prepare Site - p.31
Step 2.
Unpack The Heater Engine - p.31
Step 3.
Preparing Heater Engine - p.31
Step 4.
Positioning the Heater Engine - p.32
Step 5.
Connect Electrical Supply - p.32
Step 6.
Prepare Gas Supply - p.32
Step 7.
Insert Heater Engine Into Fireplace - p.32
Step 8.
Securing The Heater Engine - p.32
Step 9.
Connecting Gas - p.32
Step 10. Leak Testing - p.32
Step 11. Completing Heater Installation - p.32
Ensure the intended enclosure meets the requirements of the dimensions as stipulated in
“ENCLOSURE REQUIREMENTS” on page 26 and that gas and electrical supplies have been
prepared in accordance with the dimensions stipulated in “GAS SUPPLY” on page 27 and
“ELECTRICAL SUPPLY” on page 28.
Retain the cardboard carton for use in the “Positioning the Heater Engine” on page 32.
IMPORTANT
IMPORTANT
HINT
A
B
C
C
B
A