Rinnai
2
RF1200TW OIM
BEFORE YOU START
INSTALLATION REQUIREMENTS
This appliance
MUST BE
installed by an authorised person.
The installation
MUST
conform to local regulations.
The installation
MUST
also comply with the instructions supplied by Rinnai.
Service and removal
MUST BE
carried out by an authorised person.
CERTIFICATION
The Rinnai RF1200TW has been certified by the Australian Gas Association.
The Certification Number is shown on the appliance dataplate.
No parts or functions are to be modified or permanently removed from the heater.
Please keep these instructions in a safe place for future reference.
CARTON CONTENTS
The components for RF1200TW heater are supplied in separate cartons, the following table lists which components
are in each carton. Ensure that the components listed for the installation method being installed are present before
proceeding with the installation.
Item
Description
Carton
A B C
1
Rinnai RF1200TW gas fire engine
●
2
Side reflector panels
●
3
Remote control (batteries supplied)
●
4
This operation and installation manual
●
5
Gas connection kit: 200mm 3/8 Flexi tube with plug and 3/8” - 1/2” reducing flare connector
●
6
Trim & hangers - 3 or 4 sided / Black or Stainless Steel (x2 - 1 trim required for each side)
●
7
Burner media - Pebbles, Crystals or Logs, Coals and Granules *
●
*
For details regarding Log, Coal and Granule quantities see “Logs, Coals and Granules” on page 23
6
6
7
5
1
2
3
4
A
B
C
Two separarte trim sets are required for the appilaince,
one for the open side and one for the glass side.
(examples of 3 sided trims are shown)