INSTALLATION INFORMATION

Rinnai 

Split Collector IM

ROOF MOUNTING OPTIONS

For roofs with a slope of 10° or less a flat roof frame must be used.

Roof construction must be checked to ensure that the roof timbers are capable of supporting the additional load. 

(Refer to AS 3500.4 Appendix H).
The roof mounting option must be appropriate for the wind loading that is likely in the installed location.  See the 

section 'Mounting Location Suitability' on page 7.

For buildings higher than 10 metres the specifications for securing solar collectors to the building structure need 

to be determined on a case by case basis for each building by a person qualified to do so in accordance with the 

Building Code of Australia (BCA). Such specifications relate to the type of fastenings, the number of fastenings and 

their embedment into the building structure. They are determined from factors including the geographical location 

and topography, the prevailing wind conditions, building dimensions, rooftop form and structural materials, and 

the intended location of the solar panels relative to building internal, edge and corner zones. The BCA references 

AS1170.2 “Structural Design Actions Part 2: Wind Actions”, AS3600 “Concrete Structures” and AS4100 “Steel 

Structures” in relation to these specifications.  

A solution may be provided using either kit DDHRKIT2 (2 collector) or DDHRKIT3 (3 collector), in accordance with 

the instructions in the Rinnai document “High Rise Roof Mounting Frame Installation Instructions (Part Number 

15401103)

StandardInstallation

Installation details are in the section 'Collector Installation' on page 11.  This 

type of installation is not suitable for use on roofs over 10 m high.

N

FlatRoofFrame

For use on a flat roof or where the roof pitch is too low. This type of installation is 

not suitable for use on roofs over 10 m high.
Additional information is provided in the roof frame manual provided with the frame.

N

ReversePitchFrame

These comprise of a Split System flat roof frame and a side/reverse pitch kit. This 

type of installation is not suitable for use on roofs over 10 m high.
They can be used when the collectors need to be installed in the reverse direction 

to the direction the roof is facing. For example, installing on a South facing roof 

enables the collectors to be oriented to the North.
Additional information is provided in the roof frame manual provided with the frame.

N

SidePitchFrame

These comprise of a Split System flat roof frame and a side/reverse pitch kit. This 

type of installation is not suitable for use on roofs over 10 m high.
They can be used when the collectors needs to be installed side on to the direction 

the roof is facing. For example, installation on an East or West facing roof to 

enables the collectors to be oriented to the North.
Additional information is provided in the roof frame manual provided with the frame.

N

CycloneFrame

Additional Information is provided in the cyclone frame manual provided with the 

cyclone frame

N

 

Содержание Enduro SP200A

Страница 1: ...son NOT SUITABLE AS A POOL OR SPA HEATER The solar hot and solar cold pipes between the solar storage tank and the solar collectors must be suited to the high water temperatures and pressures that may...

Страница 2: ...as part of complete solar hot water systems Full instructions on the installation of the complete system can be found in the Operation Installation Manual Rinnai Split Solar Hot Water Systems All inf...

Страница 3: ...ty OH S 5 Water Quality 5 System Orientation and Inclination 5 Roof Mounting Options 6 Water Pipes and Fittings 9 Collector Installation 11 Standard Installation 11 1 Collector Installation Kit R33202...

Страница 4: ...e litres 1 3 1 5 1 6 Number risers 8 10 10 Potential Solar Output at PTR relief conditions kW 1 25 kW 1 25 kW 1 4 kW Frost Protection The Rinnai solar hot water warranty booklet specifies the location...

Страница 5: ...rate Warranty Terms and Conditions document for water quality parameters and how they affect the warranty conditions If in doubt about the water quality have it checked against the parameters listed i...

Страница 6: ...the instructions in the Rinnai document High Rise Roof Mounting Frame Installation Instructions Part Number 15401103 Standard Installation Installation details are in the section Collector Installati...

Страница 7: ...varying wind load parameters such as wind speed and wind direction multipliers The diagram below illustrates the region locations For more information on how to classify site specific wind loading par...

Страница 8: ...wind pressures increased by 3 times For installations in roof area 3 a minimum of 0 5m from the edge of the roof is recommended Height limit for all installations is 10 metres For more information on...

Страница 9: ...e foamed or equivalent insulation to optimise performance and energy efficiency Such insulation may also be mandatory under local regulations Rinnai recommend insulation to achieve an R value of 0 6 K...

Страница 10: ...he collector or leaks WARNING When connecting the collectors with compression unions ensure that the collectors are pushed together so that the olive is sitting approximately 15mm from the end of the...

Страница 11: ...sembly Assemble the collector rail components as shown Only loosely attach the collector retainers to the rails Details of component quantities are shown in the tables on page 14 to 19 MOUNTING RAIL C...

Страница 12: ...moved Place the collector s onto the roof above the lower rail If more than one collector is being installed then join them together using the compression fittings supplied Push down on the collector...

Страница 13: ...e roof purlin using a suitable fastener Position the collector s onto the roof above the lower rail If more than one collector is being installed join them together using the compression fittings supp...

Страница 14: ...N Rinnai 14 Split Collector IM 1 COLLECTOR INSTALLATION KIT R33202739 7 12 8 6 12 11 9 10 2 3 2 3 2 3 2 3 1 1 installer supplied copper pipe and insulation not shown installer supplied copper pipe and...

Страница 15: ...pression nut and olive 32201711 3 4 Bolt 22601073 M6 Bolt Washer Nut Washer 17401073 Used with collector retainers Nut 16801007 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 28801...

Страница 16: ...plit Collector IM 2 COLLECTORS INSTALLATION KIT R33202740 7 4 5 8 6 11 10 9 4 1 1 installer supplied copper pipe and insulation not shown installer supplied copper pipe and insulation not shown 2 3 2...

Страница 17: ...1 x compression nut and olive 32201711 4 2 Compression Union 1 x Nipple G compression 2 x compression nut and olive 32201709 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 2880102...

Страница 18: ...3 COLLECTORS INSTALLATION KIT R33202741 7 4 5 8 8 8 8 6 12 11 4 5 9 10 4 5 4 5 installer supplied copper pipe and insulation not shown installer supplied copper pipe and insulation not shown 3 2 2 3...

Страница 19: ...1 x compression nut and olive 32201711 4 4 Compression Union 1 x Nipple G compression 2 x compression nut and olive 32201709 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 2880102...

Страница 20: ...ocal call higher from mobile or public phones Hot Water Service Line Tel 1800 000 340 Australia Pty Ltd ABN 74 005 138 769 Internet www rinnai com au E mail enquiry rinnai com au Rinnai has a Service...

Отзывы: