background image

INSTALLATION INFORMATION

Rinnai 10 

Split Collector IM

WARNING

When connecting collectors or copper pipe with compression unions, ensure that the compression 

union is held at 2 points as shown in the diagram.  One side should be held still while the other is 

tightened.  Not doing this can cause damage to the collector or leaks.

WARNING

When connecting the collectors with compression unions, ensure that the collectors are pushed 

together so that the olive is sitting approximately 15mm from the end of the copper pipe.  This ensures 

the join will survive the expansion and contraction that can occur due to temperature fluctuations.

15 mm

Collector header pipework to be 

pushed up hard against the nipple

This ensures the copper olive is 

adequately pushed onto the the pipe.

Collector header pipes

Olive

Nipple

Содержание Enduro SP200A

Страница 1: ...son NOT SUITABLE AS A POOL OR SPA HEATER The solar hot and solar cold pipes between the solar storage tank and the solar collectors must be suited to the high water temperatures and pressures that may...

Страница 2: ...as part of complete solar hot water systems Full instructions on the installation of the complete system can be found in the Operation Installation Manual Rinnai Split Solar Hot Water Systems All inf...

Страница 3: ...ty OH S 5 Water Quality 5 System Orientation and Inclination 5 Roof Mounting Options 6 Water Pipes and Fittings 9 Collector Installation 11 Standard Installation 11 1 Collector Installation Kit R33202...

Страница 4: ...e litres 1 3 1 5 1 6 Number risers 8 10 10 Potential Solar Output at PTR relief conditions kW 1 25 kW 1 25 kW 1 4 kW Frost Protection The Rinnai solar hot water warranty booklet specifies the location...

Страница 5: ...rate Warranty Terms and Conditions document for water quality parameters and how they affect the warranty conditions If in doubt about the water quality have it checked against the parameters listed i...

Страница 6: ...the instructions in the Rinnai document High Rise Roof Mounting Frame Installation Instructions Part Number 15401103 Standard Installation Installation details are in the section Collector Installati...

Страница 7: ...varying wind load parameters such as wind speed and wind direction multipliers The diagram below illustrates the region locations For more information on how to classify site specific wind loading par...

Страница 8: ...wind pressures increased by 3 times For installations in roof area 3 a minimum of 0 5m from the edge of the roof is recommended Height limit for all installations is 10 metres For more information on...

Страница 9: ...e foamed or equivalent insulation to optimise performance and energy efficiency Such insulation may also be mandatory under local regulations Rinnai recommend insulation to achieve an R value of 0 6 K...

Страница 10: ...he collector or leaks WARNING When connecting the collectors with compression unions ensure that the collectors are pushed together so that the olive is sitting approximately 15mm from the end of the...

Страница 11: ...sembly Assemble the collector rail components as shown Only loosely attach the collector retainers to the rails Details of component quantities are shown in the tables on page 14 to 19 MOUNTING RAIL C...

Страница 12: ...moved Place the collector s onto the roof above the lower rail If more than one collector is being installed then join them together using the compression fittings supplied Push down on the collector...

Страница 13: ...e roof purlin using a suitable fastener Position the collector s onto the roof above the lower rail If more than one collector is being installed join them together using the compression fittings supp...

Страница 14: ...N Rinnai 14 Split Collector IM 1 COLLECTOR INSTALLATION KIT R33202739 7 12 8 6 12 11 9 10 2 3 2 3 2 3 2 3 1 1 installer supplied copper pipe and insulation not shown installer supplied copper pipe and...

Страница 15: ...pression nut and olive 32201711 3 4 Bolt 22601073 M6 Bolt Washer Nut Washer 17401073 Used with collector retainers Nut 16801007 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 28801...

Страница 16: ...plit Collector IM 2 COLLECTORS INSTALLATION KIT R33202740 7 4 5 8 6 11 10 9 4 1 1 installer supplied copper pipe and insulation not shown installer supplied copper pipe and insulation not shown 2 3 2...

Страница 17: ...1 x compression nut and olive 32201711 4 2 Compression Union 1 x Nipple G compression 2 x compression nut and olive 32201709 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 2880102...

Страница 18: ...3 COLLECTORS INSTALLATION KIT R33202741 7 4 5 8 8 8 8 6 12 11 4 5 9 10 4 5 4 5 installer supplied copper pipe and insulation not shown installer supplied copper pipe and insulation not shown 3 2 2 3...

Страница 19: ...1 x compression nut and olive 32201711 4 4 Compression Union 1 x Nipple G compression 2 x compression nut and olive 32201709 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 2880102...

Страница 20: ...ocal call higher from mobile or public phones Hot Water Service Line Tel 1800 000 340 Australia Pty Ltd ABN 74 005 138 769 Internet www rinnai com au E mail enquiry rinnai com au Rinnai has a Service...

Отзывы: