background image

  

Compact 2 Installation Guide: 11817-D 04-15 

  |   

15

Fixings

R1760-2

Chimney cowl

100 mm stainless steel

Guide rails

R1760-3

Flexi flue chimney 

flashing plate

(400 x 300 mm)

3.6

 m

R1760-4

Aluminium flexi flue 

3.6 m

Guide plate

Flexi flue spigot adaptor

Attaching the flexiliner flue to the unit

1.  Attach the guide rails to the heater using the predrilled holes and four screws. 

2.  Align the guide plate with the guide rails and slide the flue assembly forward until the front tab of the 

guide plate is fully forward and against the rear of the flange at the top of the heater. 

3.  Ensure the guide plate is securely fastened with two screws to the flue access plate.

Содержание Compact 2 RIBF2L

Страница 1: ...ation guide Models RIBF2N RIBF2L Standard frame Traditional frame Installer please note The gas and electrical plate of the unit is not required when attaching the traditional frame refer p 18 for fur...

Страница 2: ...For installations into a combustible opening a Rinnai zero clearance box and flue kit are mandatory Appliance must be installed with a Rinnai approved flue system This appliance shall be installed in...

Страница 3: ...ion 8 Electrical connection 9 Flueing options 10 Flueing guidelines 11 Masonry flue installations 12 Masonry installation 14 Inbuilt mock chimney 16 Completing the heater installation 18 Flame pattern...

Страница 4: ...is distributed from the top of the appliance Data plate Inside appliance on the front right hand side panel Gas connection BSPF male flare enters from the rear of the appliance Ignition Continuous sp...

Страница 5: ...y of sand and cement to level the base as required Minimum clearance required from the spigot to the back of the fireplace is 50 mm p 12 Inbuilt mock chimney W width 685 mm H height 615 mm D depth 380...

Страница 6: ...g it is recommended that a mat be placed in front of this appliance Mantels and surrounds Combustible mantels and surrounds require clearance from the unit to minimise the risk of fire Mantels and sur...

Страница 7: ...nce area around the Compact 2 without having the unit on site Glass width 500 300 300 420 300 Clearance Clearance Minimum above fire Minimum to ceiling 1100 1000 Compact 2 standard frame Glass width 5...

Страница 8: ...n of the heater Gas supply location 1 Mark off the location for the vertical centre line of the heater enclosure 2 To the right of the vertical centre line mark off both the vertical and horizontal lo...

Страница 9: ...d plug assembly through the front panel With the frame assembly removed redirect the cord and plug assembly with grommet underneath the heater to the front of the unit either left or right hand side C...

Страница 10: ...mney offset wall penetration For installations into a combustible opening with a zero clearance box Flue runs in wall then penetrates the building before terminating vertically Typically used in multi...

Страница 11: ...quate flue systems depending on the installation Minimum clearances are shown in AS NZS 5601 1 Flue terminal locations Must be compliant with Clearances Required for Flue Terminals from AS NZS 5601 1...

Страница 12: ...result Sealed means no holes or openings in the fireplace Some criteria for checking chimney soundness Rinnai strongly recommends the use of a Rinnai flexiliner flue system Failure to meet this crite...

Страница 13: ...Installation Installation servicing and repair shall be carried out only by authorised personnel...

Страница 14: ...crew the five screws securing the gas electrical plate and put aside 5 Connect flue adaptor Connect the flue adaptor to the flexiliner flue 6 Position engine Place the Compact 2 engine in front of the...

Страница 15: ...ue spigot adaptor Attaching the flexiliner flue to the unit 1 Attach the guide rails to the heater using the predrilled holes and four screws 2 Align the guide plate with the guide rails and slide the...

Страница 16: ...aligning the guide rails with the guide plate of the flue adaptor Slide the flue adaptor in until the guide plate is fully home against the rear of the flange of the heater at the top of the heater Su...

Страница 17: ...ble the zero clearance box 3 Fit zero clearance box 6 Prepare heater engine 7 Fit cladding 8 Connect flue adaptor 13 Secure flue 15 Secure the heater Guide rails Flue access plate Gas electrical acces...

Страница 18: ...enhance the realistic log burning look of the heater Do not force or block the burner ports with the granules and do not place any granules on the rear burner 4 Replace combustion chamber glass and t...

Страница 19: ...anules 1 Removing the combustion chamber glass panel Glass clamp Retaining screw Retaining screw Front feet as pivot points Test point screw Regulator Rear view of installed frame Top fold Frame assy...

Страница 20: ...d gas injectors or log set burn media has shifted from when the fire was first installed There are some warning signs that could indicate a problem Unusual smell from the appliance Continued difficult...

Страница 21: ...1 220 240 v 50 Hz BR G Y BL W W BL BL W IGN SWITCH MICR O BL SPAR KER ELECTRODE FAN 2 BR FAN SWITCH ON OFF THE R MAL 1 2 3 R BL BL R W FAN SWITCH HI LOW MICR O W S V OHS TC W R Red BL Blue BR Brown W...

Страница 22: ...ew of how all the components are fitted together and to illustrate important installation points Zero clearance box assembled and installed N B only partially shown in this image Flue adaptor connecte...

Страница 23: ......

Страница 24: ...Rinnai co nz Experience our innovation 0800 746 624 http www youtube com rinnainz Compact 2 installation guide 11817 D 04 15...

Отзывы: