
20
Rinnai I-Series Condensing Boiler Combi Manual
Securely screw the top and bottom
brackets into the wall, making sure
the screws are flush with the wall.
Use any of the holes in the top
and bottom brackets.
Make sure the securing method is
sufficient to support the weight of
the boiler. Refer to the boiler
weight in section “3.4
Specifications” of this manual.
Top
Bracket
Bottom
Bracket
The boiler must be installed in an
upright and level position. Do not
install the boiler upside down or on
its side.
IMPORTANT
The condensate collector must be filled with
water prior to installing the vent system.
Pour approximately 10 ounces (1.25 cups) of
water directly into the boiler’s exhaust port
(do not remove the 2 in. PVC adapter prior to
this).
Before operation of the boiler, the
condensate collector must be filled with
water. This is to prevent the potential of
exhaust gasses from entering the building.
Failure to fill the condensate collector could
result in severe personal injury or death.
Exhaust
Port
WARNING
Содержание COMBI i060C
Страница 124: ...124 Rinnai I Series Condensing Boiler Combi Manual ...
Страница 125: ...Rinnai I Series Condensing Boiler Combi Manual 125 ...
Страница 134: ...134 Rinnai I Series Condensing Boiler Combi Manual ...
Страница 135: ...Rinnai I Series Condensing Boiler Combi Manual 135 ...
Страница 136: ...136 Rinnai I Series Condensing Boiler Combi Manual 800000111 3 2019 ...