Fig. 18 – Vacuum Pump Application
6.4 Charging the system
Once all electrical connections are correctly made, the unit is ready to be commissioned. Refrigerant may only be added
after performing a leak test and system evacuation.
Start the system in cool mode and allow it to stabilise before checking liquid line sub-cooling and compressor suction
superheat. Refer to Start Up and Commissioning procedures (Section 7).
•
The system is pre-charged with R410a refrigerant for 15m actual pipe length
•
For lengths greater than 15m, additional charge is required. This is done by starting the unit and using it to
draw refrigerant (liquid only) through the compressor suction pipe Schrader valve, located in the
compressor compartment. Refer to Section 6.2.
•
Refrigerant containers should be opened slowly to avoid injury.
•
Always use protective gloves and protect your eyes when charging refrigerant.
Refrigerant Charge Adjustment
The outdoor unit is pre-charged with refrigerant for a 15 m pipe run.
Please calculate the refrigerant adjustment required according to the diameter and length of the liquid line pipe of the
indoor/outdoor connection.
System Refrigerant Adjustment
Less than 15m
REMOVE Refrigerant
OR
30g/m for Ø9.52 liquid line
More than 15m
ADD Refrigerant
60g/m for Ø12.7 liquid line
The correct measurement and assessment of superheat and sub-cooling values should be the only measures used
to confirm correct system charge
.
•
Superheat should be between 4 and 9K
•
Sub-cooling should be between 2 and 8K
•
Discharge gas temperature should not exceed 130°C in any circumstances
•
Do not overcharge.
Содержание Brivis DINLU10Z7
Страница 7: ...7 2 4 Outdoor Unit Fig 5 Outdoor Units DONSC10Z71 DONSC13Z71 15Z71 17Z71 ...
Страница 14: ...14 5 4 Wiring Diagrams Fig 11 Typical Indoor Unit Wiring Diagram DINXU DINLU SERIES ...
Страница 16: ...16 Fig 14 Shielded Communication Cable Between Indoor and Outdoor Units ...
Страница 28: ...28 ...