RIMSA PENTALED105 Скачать руководство пользователя страница 1

 

 

Installation manual  

MI_006_GB 

13/09/12 

Rev.4 

Pag. 1 di 19 

 

Installation manual for 

surgical light system  

 
 

PENTALED81  

 

ceiling 

mobile 

 

PENTALED105 

 

ceiling 

mobile

 

Содержание PENTALED105

Страница 1: ...Installation manual MI_006_GB 13 09 12 Rev 4 Pag 1 di 19 Installation manual for surgical light system PENTALED81 ceiling mobile PENTALED105 ceiling mobile...

Страница 2: ...y of manual This operator s manual refers to the following products PENTALED 81 single ceiling version PENTALED 81 double ceiling version 81 81 81 30E PENTALED 81 mobile version PENTALED 105 single ce...

Страница 3: ...end the data contained in this document at any time and for any reason without prior notice inasmuch as Rimsa is constantly seeking new solutions which lead to product evolution Rimsa therefore reserv...

Страница 4: ...rangement of the site 10 2 2 Electrical arrangement of the site 13 3 Product installation 13 3 1 Ceiling version PENTALED 81 105 13 3 1 1 Anchoring tube installation 13 3 1 2 Installation horizontal a...

Страница 5: ...tors By qualified operator is meant whosoever has attended a course relating to the installation maintenance and use of the product organised by RIMSA or alternatively whosoever has carefully read thi...

Страница 6: ...life and use must possess Installation the Product must be installed by a qualified Installer and or Technician Use Professional medical personnel Routine maintenance Qualified technician in possessi...

Страница 7: ...nual In this installation manual and on the Product important directions are marked by means of symbols and identifying words Identifying words such as DANGER WARNING or CAUTION indicate the classific...

Страница 8: ...ble Breakable package Humidity suffering package Do not overlap packages with pallet Weight of the package 1 5 Other graphic symbols used on the Product The symbols present on the Product are listed b...

Страница 9: ...s due to the fact that the electrical system of the premises where the machine is installed is not in compliance with International or local standards for electrical systems in premises used for medic...

Страница 10: ...nly competent law court shall be that of Milan 2 Mechanical and electrical arrangement of the site NOTE The building and electrical arrangement works for the installation of the Product are the respon...

Страница 11: ...mises in which the Product is to be installed The anchoring tube is calculated to install the Product at a finished height from the floor to the cupola of the Product with the oscillating arm in a hor...

Страница 12: ...opening the anchor The anchor tie rod will immediately take the weight 6 Make the remaining 5 holes and insert the anchor tie rods as in previous points 2 5 7 After one hour tighten the anchor tie rod...

Страница 13: ...electrical system must be certified by an electrician licensed to issue the conformity certificate the verification of the grounding circuit must be certified as required by the norms in force 3 Prod...

Страница 14: ...e on the anchoring tube in correspondence of the slot of electrical panel clamping frame and with an M6 tap 10 thread the hole itself Finally secure the electrical panel to the tube by tight the M6x16...

Страница 15: ...m in the same position of the drawing with the fork to the left of the arm and the screw of the friction 4 of the oscillating arm under Push the hub lock 2 on the fork hub 3 and rotate it in order to...

Страница 16: ...ase 1 Pass the cable of pipe 4 also inside the upper pipe 2 and position it corresponding to the holes of the inferior one 3 tightening the 4 countersunk screws M5x10 DIN7991 3 2 3 Oscillating arm ins...

Страница 17: ...ston to the battery just for battery models Then reposition the cover and now you just need to connect the power cable plug to the network line CAUTION Irreparable damage to the Product Fuse protectio...

Страница 18: ...For such reason it is necessary to tick each point when it is treated 1 Verify the suitability of the ceiling on installation of the Product 2 By means of a spirit level verify the perpendicularity of...

Страница 19: ...Installation manual MI_006_GB 13 09 12 Rev 4 Pag 19 di 19 Note...

Страница 20: ...Drawing code Rev Data 12 CEILING PLATE SHEET TEMPLATE SCALE1 1 1 2 3 4 5 6 Sheet format A3...

Страница 21: ...Drawing code Rev Data 13 2 1 3 3 3 4...

Страница 22: ...Drawing code Rev Data 38 1 2 3 4 5 n 6 x 18 holes n270 n300 Tube external diameter 120...

Страница 23: ...A B C Drawing code Rev Data 15 C 1 2 A 4 3 B 3 5 8 7 11 12 13 9 10 5 7 8 6 127...

Страница 24: ...Drawing code Rev Data 40_JP_81 1 2 3 4 115...

Страница 25: ...A Drawing code Rev Data 116 A 1 2 3 4 5...

Страница 26: ...Drawing code Rev Data 1 18 07 2012 129 A A B B 1 2 1 2 3 4 2 3 5 1 2 6 7 new installation procedure due to change to the product Starting from S N 120928 04834 1 excluded S N 121010 04597 1 2 3...

Страница 27: ...A A Drawing code Rev Data 130 1 2 3 4 6 5...

Страница 28: ...Drawing code Rev Data 133 1 2 2 2 2 3 4...

Страница 29: ...Drawing code Rev Data 136 5 6 3 3 1 8 8 7 4 2 3 8...

Страница 30: ...A A Drawing code Rev Data 2 8 10 1 6 3 4 2 5 9 7 137...

Отзывы: