4-4.Caution in the system engineering 
 
 

Unstable power and noise may cause error of performance and alarm. 
For the system to use this unit, it is required to make design based on this 
manual descriptions. 

 
(1) Stable power used 

While the system gets stable at power failure, the external output and alarm contact may be on and the 
care for it must be taken.    In such case, use the standby battery or take an appropriate action in the 
receiver side.    Supply the following power to this unit . 

 

Power voltage 

DC24V±10% 

Power failure   

tolerance time 

Approx 50msec. 
(For power failure of 50msec, it re-starts) 
To  warrant  the  continuous  operation,  install  the  UPS 
(Uninterrupted Power Supply) or standby battery outside. 

Others 

Do  not  share  the  power  involving  with  high  power  load 
and high frequency noise. 
According to requirement, use line filter and separate it 
from noise source. 

 
(2) Designing to consider radiation 

When install the closed self-standing control panel, mount the fans in the upper and lower part. 

 
(3) Lightning measures 

Lightning 

surge 

There is the problem “Lightning”.    When make outdoor wiring of cable at factory or plants etc or 
when  make  a parallel  wiring in  the same  duct with  the  cable in  from  outdoor even  at  the indoor 
wiring.    If the lightning is a huge generation source, the cable is a reception antenna and there is 
the case that cable connecting instrument is broken.    It is impossible to prevent the generation of 
lightning.    If  the  cable  should  put  in  metal  tube  or  laid  in  the  underground,  it  is  impossible  to 
prevent the inductive lightning surge generating from the thunder. 

Lightning 
measures 

There is not the complete countermeasure for it but the following method can be considered. 
Make the suitable treatment accordingly.     
a)

 

The transmission signal route is arranged for connection by the optical fiber cable etc. 

b)

 

Countermeasure by the lighting arrester (Cable safety retainer).    There is the way to install 
the  lightning  arrester  just  before  the  field  apparatus  and  the  central  control  station.    The 
position of the lightning arrester installation is at each point of cable laid out from the outdoor 
to the indoor.    The lightning arrester builds in the circuit to remove the surge voltage to be 
the  source  for  the  damage  of  field  apparatus  (Protection  resistor,  zero  diode  etc.)  and  is 
designed to protect the apparatus.    But as the signal may be attenuated due to the lightning 
arrester, check the action and it is required to use. 

Grounding 

Surge noise shall be generated from the thunder lightning or except it. 
To protect detector from these cause, be sure to make grounding. 

 

*In  the  lightning  rod,  there  is  the  circuit  to  remove  the  surge  voltage  to  be  a  cause  of  damage  from  field 

instruments. 
By installing the lightning rod, the signal may be attenuated.    When install the lightning rod, it is required to 
check the performance in advance. 

CAUTION 

Содержание OX-591

Страница 1: ...PT1E 0899 FOR USERS OPERATING INSTRUCTION MANUAL FOR INDICATOR ALARM UNIT OX 591 ...

Страница 2: ... procedure 11 4 3 Installation place 12 4 4 Caution in the system engineering 13 4 5 Grounding 15 4 6 Wiring 16 5 OPERATION METHOD 5 1 Preparation for start up 17 5 2 Basic performance flow 17 5 3 Start up procedure 5 3 1 Power on 18 5 4 Explanation of performance Detection mode 5 4 1 Display action 19 5 4 2 External output action 20 5 5 Maintenance and adjustment 5 5 1 Maintenance mode 21 5 5 2 A...

Страница 3: ...3 Replacing the parts 30 7 4 Measures when operation is stopped or installation place is moved 7 4 1 Stopping the normal operation 30 7 4 2 Changing the installation place 30 7 5 Storage or measures when the unit is not in use for a long time 30 8 SCRAP THE PRODUCT 30 9 MAEASURES AT AN ABNORMAL CASE 9 1 Trouble alarm 31 9 2 Responding to trouble alarm 31 9 3 Before it is thought to be a trouble 31...

Страница 4: ...Detection range Action 1st alarm 2nd Alarm Prevention of oxygen deficiency 0 25vol Lo LoLo alarm Lo Lo General detection Including oxygen leakage 0 5vol 0 10vol 0 25vol Hi HiHi alarm Hi Hi Lo Hi alarm Lo Hi 0 50vol Lo LoLo alarm Lo Lo Take care that an alarm action and a relay output are different from application for use This operating instruction manual describes on the application for preventio...

Страница 5: ......

Страница 6: ......

Страница 7: ...peration When operate it not to follow this manual repair it by other rating parts or modify it on his own the safety and quality of products can not be secured Then when an accident take place by it we cannot assure our responsibility on them Take enough consideration for instrumentation to keep safety even if disconnection of power and signal lines defect of operation or trouble would be happen ...

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ...AL1 AL2 Operation part MODE UP DOWN SET POWER INPUT DC24V Power supply part Gas alarm contact AL1 AL2 Trouble alarm contact TROUBLE Standard setting Non exciting Non exciting at normal a contact Contact closes at alarm Alarm contact control part 4 20mA transmission Transmission part OX 591 ...

Страница 12: ...ngagement lever at down position mount into the case Confirm that the edge connector is put in firmly Confirm that the disengagement lever is turned upward when indicator alarm unit is mounted into the case firmly After confirmation of lever position put ON the power switch and then close the cover 2 Removal of the unit Open the front cover of this unit Confirm that the power switch is at OFF Push...

Страница 13: ...intenance regularly Then do not install at the place where there is danger at maintenance time When required to stop the system at maintenance time unable to maintain if not remove a part of system or unable to detach the case due to the pipe or rack etc do not install such place Be sure to ground when installing to the equipment Do not install at places where direct sun drought or where the tempe...

Страница 14: ...ase that cable connecting instrument is broken It is impossible to prevent the generation of lightning If the cable should put in metal tube or laid in the underground it is impossible to prevent the inductive lightning surge generating from the thunder Lightning measures There is not the complete countermeasure for it but the following method can be considered Make the suitable treatment accordin...

Страница 15: ...s described by the conditions of resistive load When use the inductive load for alarm contacts the very high reverse electromotive voltage may be generated and the following trouble tends to be produced Contact part of relay is melted adhesively and the contacts can not be activated High voltage is put inside of indicator alarm unit and then electrical parts may be damaged As it is big noise the t...

Страница 16: ...to keep stable operation of this unit Do not connect earth wire with gas pipe Make grounding corresponding to D class grounding Grounding resistance below 100ohms CAUTION The inductive load shall not be used in principle Do not use fluorescent lamp When use the inductive load make the contact amplification outside but the outside relay coil belong use the relay driven by the low voltage within AC1...

Страница 17: ...tact output AL2 2nd alarm contact output 4 20mA output GND 24V CVVS 1 25sq 2c 3 4 5 6 CAUTION Use CVVS 1 25sq cable for the connection of detector head Do not distribute power cable and signal cable together with power line for motor etc This unit applies a connector type terminal plate for easy wiring Be care not to give a high load to the connector We can not warrant the performance of this unit...

Страница 18: ...uring adjustments Even relay contact works treat that any influence will not be given to the outer 5 To prevent fire check that the designated fuse is used 5 2 Basic performance flow In normal operation it is used on detection mode Power on Stand by Initial clear approx 25sec Detection mode Alarm test mode SET switch Press for about 3 sec MODE switch Press for about 3 sec Maintenance mode Span adj...

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...s concentration When exceeds detection range Over range LED shows Power light PW Green It keeps steady light Alarm light AL1 Amber AL2 Red There are two alarm levels When reading reaches each preset alarm level or exceeds each preset alarm level this starts flashing and then returns to continuous lighting after reset operation Standard 2 External output 4 20mA output Electric current proportional ...

Страница 29: ...ctor After checking that there is no danger actions for gas leak shall be taken 6 2 3 Alarm other than gas detection t may respond to interference gas For interference gases contact the nearest agent or RIKEN KEIKI t may be caused by drifting due to the change of long time elapsed sensor Check the reading by daily check and make calibration through authorized service agent whenever necessary t may...

Страница 30: ...nt in maintenance mode at detector head side Alarm test Check that the alarm light flashes and buzzer sounds 7 1 2 Regular maintenance check The following items shall be checked at regular check Daily check Cleaning of this unit Adjustments Function check Parts replacement Others 7 2 Maintenance contract for regular check To maintain the safety operation of the unit it is recommended to keep the m...

Страница 31: ...rmal temperature and humidity away from direct sunlight In a place where gases solvents or vapors are not present 8 SCRAP OF PRODUCT AND SENSOR Scrap of products Regarding indicator alarm unit and detector head complete treat it in the same as industrial scrap Non flammable goods CAUTION For replacement of sensors and parts etc contact our service agent or RIKEN KEIKI CAUTION When move its install...

Страница 32: ...r head Re check the detection system and contact our nearest agent or RIKEN KEIKI There is the case of electrical line trouble such as shut off of power This will be treated by the re check of stand by battery electrical line filter insulation transformer etc or those addition 9 4 Trouble shooting 1 PW TR light does not illuminate Cause and action Is it OK with power cable connection Connect power...

Страница 33: ...ction of sensor cable Check whether sensor is connected or the sensor cable connector is connected to the sensor If can not be recovered contact our nearest agent or RIKEN KEIKI 5 Fuse disconnection Performance This unit can not work Cause and action The trouble of this unit or trouble of external power source can be considered Search this cause and after taking its measures replace the fuse with ...

Страница 34: ... the output of signal showing the maintenance mode condition is displayed on the external output signal By this the maintenance is carried out independently on this unit Press MODE switch for 3 seconds and the maintenance mode starts nitial clear The reading will be unstable for a few seconds after power on In this moment to prevent the error of running the alarm contact shall be cut off Then sign...

Страница 35: ...t normal non exciting at alarm Transmission scheme Analog transmission Specification of transmission DC4 20mA non isolated load resistance less than 300Ω Gas detector head signal Direct signal from the sensor Cable between detector CVVS worth of shield cable 2 core Distance between detector Max 600m with CVVS 1 25mm2 cable Various functions Alarm delay Suppression Peak hold Alarm trend history Pow...

Страница 36: ......

Отзывы: