Tapes geometry measurement system
[Version 1.0] 08
th
December 2014
14
Figure 16
Figure 17
When typing the corresponding values the keyboard appears automatically.
11. Intended use
11.1. Prepatation for use
Preparation of the system includes:
external inspection;
set up on a conveyer;
switching the system;
calibrating the system;
system setup.
11.1.1. External inspection
Before operating it is needed to ensure of the serviceability of the equipment,
check the cables, ground wires. Check the condition of output windows of the scanner
and, if necessary, wipe them with a soft cloth.
11.1.2. Set up on a conveyer
Install the system on a conveyer according to the Fig. 2-5 of this manual. Make
the electrical connections in accordance with the Fig. 8.
11.1.3. Switching the system
11.1.4. Calibrating the system
Выполнить калибровку системы в соответствии с п. 10.3.2 настоящего руководства.
Калибровка установки производится: Calibrate the machine according to the Para-
graph 10.3.2. Calibration should be held:
on a weekly basis before the work shifts,
if the position of the system was changed,
when the ambient temperature has changed (several degrees in average
per day in relation to the previous day).
11.1.5. Configuring system settings
Configure the settings according to the Paragraph 10.4 and 10.5.
11.1.6. Checking the system
To check the functionality of the system conduct a full cycle control of the geo-
metrical parameters of the control sample tape. It is recommended to conduct at list one
functional test of the system in a month.
11.2. Operating the system
The geometric parameters measurement cycle is fully automated and operation
of the system is reduced to the work with the program.
prepare the system according to the Paragraph 11.1.
to start the measurement process press the
Start
button
.