background image

Page 12

 / PM6

2.2001

8.5 Bearings (see pos. 48 and 541 E 220/1

VWP 400-3 resp. E 221/1

VWP 160-3 / 250-3)

Check bearings for wear after 15,000 operating hours, however exchange the bearings at the latest after 20,000 operating hours.
8.6 Valves (see pos. 4 E 220/1

VWP 400-3 resp. E 221/1

VWP 160-3 / 250-3)

Check the exhaust valves (see also pos. 6 pict. 3) of the MD- resp. HD-stage after 8,000 operating hours for wear or damaging.
If necessary exchange the valves.

9. INOVAC datas
9.1 INOVAC dimension drawing
Dimensions of the INOVAC 

 see data sheet D 221 or DA 221 (USA).

9.2 Relevant pump data

maximum product entry temperature: 60° C

maximum exhaust gas back pressure: 0.3 bar overpressure

average noise level 

 see data sheet D 221

maximum noise level: 

 approx. 80 dB(A) at VWP 160-3 / 250-3 and approx. 82 dB(A) at VWP 400-3

9.3 Drive motor data
Motor data see chapter 5.2.2
9.4 Relevant stage data
Material: rotary piston 

 GGG-40 • housing 

 GGG-40 • piston rings 

 PTFE • shaft sealing rings 

 PTFE

O-Rings 

 Viton, PTFE encapsulated • stage connection pipes 

 GGG-40, chemically nickel plated

9.5 Relevant data for lubrication

Oil volume stages LP,MP and HP 1.31 litres each stage

Interval of change every 8,000 operating hours or at least yearly

Recommendations for lubricating oil:

Bechem VBL 100, BP Energol RC 100, Esso rotary oil 100, Mobil vacuum pump

oil heavy, Shell Tellus oil C 100 or Aral Motanol HK 100

All other bearings are sealed for life variety

9.6 By-pass system data
Material: valves and flexible connection line with valve housing 1.4571 stainless steel
9.7 Relevant cooling data

Quantity of coolant: VWP 160-3 

 110 l, VWP 250-3 

 105 l, VWP 400-3 

 150 l

Capacity of coolant pump: approx. 20 l/min

50 Hz, approx. 25 l/min

60 Hz

Maximum permissible pressure in system 0.3 bar overpressure

9.8 Sealing gas system relevant data

Entry pressure sealing gas 0.3 to 0.4 bar overpressure

Average capacity of sealing gas approx. 1 Nm

3

/hr (this may be reduced when pump is new)

9.9 Spare parts lists
VWP 400-3: E220/1 drive and gearbox • E220/2 radiator cooling • E220/3 fresh / external Cooling • E220/4 basic unit
VWP 160-3 / 250-3: E221/1 drive and gearbox • E221/2 radiator cooling • E221/3 resh / external Cooling • E221/4 basic unit

10. Instructions for storing and conservation of INOVAC-Vacuum pumps
In case of storing the vacuum pump longer than 12 months after delivery (up to 3 months), please consider one of the following
instructions.
1. Protection of compressing chamber by preservative oil:

The suction side of the warm vacuum pump must be filled with small quantities of oil BP Vanellus C 3 SAE 30 until the surface
is totally moistened.

Surplus oil can be drained at the exhaust flange.

Suction- and exhaust flange should be sealed with blanke flanges.

2. Protection of compressing chamber by sealing gas:

The suction side must be sealed with a blank flange.

Sealing gas can be flushed into the vacuum pump when using the bleeding valve connection.

After that the exhaust side should be sealed with a blank flange.

The compressing chamber will be filled until 50 mbar overpressure and afterwards sealed.

In both cases the cooling liquid (usually a water/glycols-mixture 1:1) must be filled into the the vacuum pump up to a maximum
from the customer.
The store room for the pumps must be dry and free of all corrosive materials. The ambient temperature should be constant and
don't come under 5°C.
For storing the vacuum pumps more than 12 months, please contact your supplier.
If the vacuum-pump is shut down between two operations for longer time, maximum 12 months, so there are two possibilities
to the preservation:

a.) Preservation of the vacuum pump by means of oil and nitrogen as described under point 1 and 2.
b.) Preservation of the vacuum pump by monthly running.

Procedure: Operate the vacuum pump once per month until the coolant temperature reaches 50°C. Ensure the suction is
closed and the discharge open.

The procedures above are also suitable if the pump is not run on process duty for prolonged periods. However, it is essential to
ensure that all product deposits, which are liable to stick in the vacuum pump, are totally removed by flushing with a suitable
solvent.

Содержание INOVAC VWP 160-3

Страница 1: ...BE 221 2 4 99 Werner Rietschle GmbH Co KG Postfach 1260 79642 SCHOPFHEIM GERMANY 07622 392 0 Fax 07622 392300 E Mail info rietschle com http www rietschle com Rietschle UK Ltd Bellingham Way NEW HYTHE...

Страница 2: ...n 8 6 Coolant 9 6 1 External cooling 9 6 2 Radiator cooling 9 6 2 1 Cooling liquid monitoring 9 7 Initial Operation 10 7 1 Risks for service staff 10 8 Maintenance 10 8 1 Oil lubrication 10 8 1 1 Bear...

Страница 3: ...vel there will be a loss in capacity For further advice please contact your supplier The standard versions may not be used in hazardous areas Special versions with Ex proof motors can be supplied All...

Страница 4: ...mosphere without a backing pump INOVAC is the only known Roots vacuum pump that has been especially designed to provide a solution to this problem The back flow which causes the excess heat generation...

Страница 5: ...ers the compression chamber is sealed from the bearing housing by a labyrinth seal consisting of two piston rings PTFE In addition a shaft sealing ring PTFE running on a hardend pressed on shaft sleev...

Страница 6: ...The by pass valves close when the interstage pressures are lower than the exhaust pressure 3 4 6 Sealing gas The INOVAC is supplied as standard with the facility to pressurise the shaft sealing ring c...

Страница 7: ...250 3 VWP 400 3 9 10 5 Installation 5 1 Mechanical installation see data sheet D 221 5 1 1 Mounting Pumps that have reached operating temperature may have a surface temperature of more than 70 C depe...

Страница 8: ...ll cabling used on starters should be secured with good quality cable clamps We recommend that motor starters should be used that are fitted with a time delayed trip resulting from running beyond the...

Страница 9: ...frost A BP anti frost X 2270 A Glacelf Glysantin Glycoshell AF 405 Veedol Antifreeze The water must be ph neutral The liquids should be well mixed before fill in A simple pouring together is not suff...

Страница 10: ...tive that the unit cannot be re started during the maintenance operation Do not work a pump that is at its normal operating temperature as there is a danger from hot parts hot lubricant or hot coolant...

Страница 11: ...ing and the drive coupling half Remove the intermediate flange on the NP stage MS Removing the MP stage HS is carried out in the same manners as with LP stage Assembly of the stages is in reverse orde...

Страница 12: ...400 3 E220 1 drive and gearbox E220 2 radiator cooling E220 3 fresh external Cooling E220 4 basic unit VWP 160 3 250 3 E221 1 drive and gearbox E221 2 radiator cooling E221 3 resh external Cooling E2...

Отзывы: