17
20159324
GB
Installation
5.6
Access to head internal part
In order to reach inside the combustion head (Fig. 11) proceed as
follows:
remove the screw 1) and the internal part 2).
Fix the flange 9)(Fig. 10) to the plate of the boiler interposing
the insulating flange gasket 6)(Fig. 10) supplied with the
unit.
Use the 4 screws, also supplied with the unit, after first
protecting the thread with an anti-locking product.
The seal between burner and boiler must be airtight.
5.7
Positioning the probe - electrode
If in the previous check the position of the probe or electrode was
not correct, remove the screw 1)(Fig. 11) extract the inner part
2)(Fig. 11) of the head, and adjust them.
Fig. 11
D3835
ATTENTION
Before securing the burner to the boiler, check
(through the opening of the blast tube) that the
probe and electrode are correctly positioned, as in
Fig. 12.
ATTENTION
Do not rotate the probe but leave it as in Fig. 12; if
it is too close to the ignition electrode, it could
damage the control box amplifier.
ATTENTION
Respect the dimensions shown in Fig. 12.
3mm
7m m
2m m
5mm
Fig. 12
D10833
PROBE
ELECTRODE
Содержание RS 25/M C05
Страница 2: ...Translation of the original instructions...
Страница 44: ...20159324 42 GB Appendix Electrical panel layout RS 25 35 M C05 1Ph...
Страница 45: ...43 20159324 GB Appendix Electrical panel layout RS 35 M C05 3Ph...
Страница 50: ......
Страница 51: ......