b
Refer to the instruction manuals for the
r
TECH
control panel and for your chosen burner.
1
2
3
2
1
5
8
7
9
10
6
4
RTQ 2700 3S
- engage the bottoms of the rear side (1) and front side
panels (2) in the bottom rails (3), then hook their top lips
over the top rails (4) running between the front and rear
heads;
- secure the side panels in place with the top cross beam
(5) and the screws provided;
- mount the chosen control panel on the front top panel
(6), referring to the control panel booklet;
- route the electrical cables and insert the sensors in their
sockets;
- fit the cable grommets provided into their seats in the
panels;
- fit, in this order, the rear panels (7) and (8), then the
central panel (9) to close the top of the boiler;
- once all the panels are in place, fit the front cover (10)
over the top of the door.
FITTING THE CASING PANELS
INSTALLER
26