background image

 

RIELLO S.p.A.

 

I - 37048 San Pietro di Legnago (VR)

 

Tel.: +39.0442.630111

 

http:// www.rielloburners.com

 

Con riserva di modifiche - Änderungen vorbehalten! - Subject modifications - Sous réserve de modifications

Содержание 3434623

Страница 1: ...er installazione uso e manutenzione Bruciatore di nafta Heiz lbrenner Heavy oil burner Br leur fioul lourd CODICE CODE MODELLO MODELL MODELE MODEL TIPO TYP TYPE 3434623 PRESS 45 N ECO 627 T 3434624 PR...

Страница 2: ...ture adjustment 7 4 7 Start up programme 9 4 8 Ecological oil burners 9 4 9 Emulsified fuel oil functioning 9 4 10 Start up programme diagnostic 10 4 11 Operating fault diagnostics 10 2893 O The burne...

Страница 3: ...ctrical intake power 4 1 kW Pump 60 kg h at 20 bar D2715 D2628 Burner Boiler plate NOTE The weight of the rear part of the pumping assembly exerts flexure stress on the guides you are advised to hold...

Страница 4: ...vacuometer fitting 5 fig 1 The pipes should be perfectly airtight When the tank is placed below of the burn er level the return pipe should arrive at the same level as the suction pipe In this case t...

Страница 5: ...P CMP CMV CMP Pump motor contact maker CMV Fan motor contact maker CR Pre heater contact maker F Suppressor FR Photocell MB Burner terminal strip MP Pump motor MV Fan motor PA Air pressure switch R1 A...

Страница 6: ...Verify the burner stop by opening the boiler thermostat and the burner lock out by darkening the photocell IN Manual switch MB Burner terminal strip H Lock out signal TL Limit remote control TR Adjus...

Страница 7: ...ompletely closed A partial opening of the air damper might be obtained by mov ing this lever leftwards on the plate The new position of the air damper is detectable when the burner is off Do not excee...

Страница 8: ...mum value contact thermostat switches off the resistors when in case of failure of the adjustment thermostat the temperature increases inside the pre heater In case of abnormal temperature make sure o...

Страница 9: ...ater line be turned off the fuel must be pre heated for approximately 30 minutes before the burner start up On the contrary the nozzle holder resistor shall be supplied with an independent single phas...

Страница 10: ...ils that in certain temperature and speed conditions are particularly aggressive for the vital parts of the burner The objective has been achieved with the reduction of the transiting speed in some of...

Страница 11: ...flame ok Operation with weak flame Electrical supply lower than 170V Lock out Extraneous light Key Off Yellow Green Red SIGNAL PROBABLE CAUSE 2 blinks A stable flame is not detected in the safety time...

Страница 12: ...RIELLO S p A I 37048 San Pietro di Legnago VR Tel 39 0442 630111 http www rielloburners com Con riserva di modifiche nderungen vorbehalten Subject modifications Sous r serve de modifications...

Отзывы: