4.4 Installation
The conditions and starting points that follow are applicable for installation. Make sure that the
working conditions comply with the, local or national, laws and regulations.
•
Do not remove the product from the packaging until a short time before the installation.
•
Use the correct work equipment and accessories (belts, chains, pallets or such) if it is not
permitted or possible to put the product manually in position.
•
Only use a permitted mounting position when you install the RW motor-gearbox. Refer to §4.2.
•
The mounting plates are available in different dimensions for different configurations. Refer to
“Optional mounting plates ❶”.
Install the RW motor-gearbox onto the mounting plate or an alternative (refer to “Optional
mounting plates ❷”):
•
With the supplied spring washers and bolts M10x20 (2x) for an RW45 drive unit
•
With the supplied spring washers and bolts M10x25 (3x) for RW240–600 and RW70/140 drive
units
•
With the supplied spring washers and bolts M12x25 (4x) for an RW800 drive unit.
Refer to “
Minimum Screw-in depth (SID)
” which also shows the
standard bolt-installation (SBI)
.
•
The RSU or RLS limit-switch system and other components (RPU and such) can give information
“in operation” and/or during commissioning. Thus, easy access and a satisfactory view is
recommended for the location of the RW motor-gearbox.
•
In the factory the reductor is filled with the necessary quantity of grease (usually only RW45) or
oil. After installation interchange (of reductors filled with oil) the plug in the highest position with
the vent plug! Refer to §4.2.
Ridder Drive Systems B.V.
T
+31 (0)341 416 854 -
F
+31 (0)341 416 611 -
I
19